CECS 118-2000 in English
SUPERSEDEDSpecification for acceptance test of water-cooling tower
- Issued on:2000-09-20
- Implemented on:2000-12-01
- File Format:PDF
- Delivery:Via email within 5 business days
$1,611.00
Scope
This procedure provides unified procedures for the thermal performance acceptance test, noise test and droplet loss test of circulating water cooling towers, as well as the measurement methods of various parameters and the processing methods of test data. This procedure is applicable to the acceptance test of wet cooling tower installation sites, and is not applicable to the acceptance test of dry cooling towers, wet and dry cooling towers and jet cooling towers. Non-acceptance cooling tower tests may be performed with reference to this procedure.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

CECS 2090 in English
CECS 2090 Specification for design and construction of autoclaved lime-sand brick masonry structure
1990-09-25 -

CECS 13-2009 in English
Standard test method for fiber reinforced concrete
2009-12-15 -

CECS 288-2011 in English
Technical specification for fabrication and installation of wooden product in building decoration engineering
2011-04-02 -

CECS 28-2012 in English
Technical specification for concrete-filled steel tubular structures
2012-06-26 -

CECS 266-2009 in English
Construction site safety management regulations
2009-11-13 -

CECS 24:90 in English
CECS 24:90 Regulation of Application Technology of Fire Resistive Coating for Steel Structure
- -

CECS 231:2007 in English
Specification for Construction and Acceptance of Aluminum-plastic Composite Panel Curtain Walls Engineering
- -

CECA/GC 8-2012 in English
Verification specifications of construction project cost
- -

CECS 114-2000 in English
Specification for design of oxygen aeration
2000-06-27 -

CECS 2322007 in English
Technical Specification for AD Single Stack Drainage System
-