DL 497-1992 in English
VALIDRules for operational management of load reduction of electric power system through automatic low frequency
- Issued on:1992-12-01
- Implemented on:1993-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$88.00
| Standard No: | DL 497-1992 |
| Document status: | VALID |
| Title in English: | Rules for operational management of load reduction of electric power system through automatic low frequency |
| Title in Chinese: | 电力系统自动低频减负荷工作管理规程 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 1992-12-01 |
| Implemented on: | 1993-05-01 |
| Chinese Classification: | F20- |
| Professional Classification: | DL-Electricity |
| Related Keywords: | electric power system
power system electric power bureau power supply bureau automatic low frequency scopeautomatic low-frequency load |
| Related Topics: | Outlet Overwork
Power Systems management procedures reduce low frequency lighten the burden How Automatic Works lower load Working principle of automatic meter Animation of working principle of self-priming tank mRNA negative charge Vaccine Management Automation Workstation Group Vaccine management automated workstation. group Power system automatic low frequency |
自动低频减负荷装置是防止电力系统发生频率崩溃的系统保护。为了加强自动低频减负荷的管理工作,实现电力系统的安全稳定运行,保证向重要用户不间断供电,特制定本规程。
Scope
Automatic low-frequency load shedding devices are system protections that prevent frequency collapse in power systems. In order to strengthen the management of automatic low-frequency load shedding, achieve safe and stable operation of the power system, and ensure uninterrupted power supply to important users, this regulation is formulated. The management of automatic low-frequency load shedding shall be governed by the principles of unified leadership and hierarchical management. Each network bureau and provincial bureau shall designate a leader in charge of production to be responsible for the automatic low-frequency load shedding work of the network and the province. The Network Bureau and the Provincial Bureau are respectively responsible for the setting, operation and technical management of the entire network and the provincial automatic low-frequency load shedding scheme; the Electric Power Bureau (Power Supply Bureau) is responsible for the implementation of the automatic low-frequency load shedding scheme in the region and the daily operation management and regular inspection of the equipment. and valuation changes. Automatic low-frequency load shedding involves power users from all walks of life and different departments. The Electric Power Bureau (Power Supply Bureau) should strengthen the management of automatic low-frequency load shedding for power users to ensure the safety of the power grid. The planning, design, capital construction, production and operation departments of the power system, power users and grid-connected power plants should all comply with this regulation. When implementing this regulation, each network bureau and provincial bureau can formulate specific implementation rules based on the situation of this system.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 1166-2012 in English
Field Test Guidelines of Excitation System for Large Synchronous Generators
2012-08-23 -

DL/T 5286-2013 in English
Construction Technology Guide for Tension Stringing of ±800kV Overhead Transmission Line
2013-03-07