Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
roads scopethis standard dail calipers scopethis standard gas desulfurization gypsum
DL/T 1223-2013 in English

DL/T 1223-2013 in English

SUPERSEDED

Integrated Gasification Combined Cycle Power Generation Units Performance Acceptance Test

  • Issued on:2013-03-07
  • Implemented on:2013-08-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $1,320.00
$1,281.00
Standard No: DL/T 1223-2013
Document status: SUPERSEDED
Superseded by: DL/T 1223-2023 Performance acceptance test of integrated coal gasification combined cycle power generation unit
Superseded on: 2024-06-28
Title in English: Integrated Gasification Combined Cycle Power Generation Units Performance Acceptance Test
Title in Chinese: 整体煤气化联合循环发电机组性能验收试验
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2013-03-07
Implemented on: 2013-08-01
ICS Classification: 27.100-Power stations in general
Chinese Classification: F24-Electric power testing technique
Professional Classification: DL-Electricity
Related Topics: gasification
Cycle Performance Discharge
Yuelian testing machine
overall experiment
overall experiment
Gas tank acceptance
group
Generator acceptance
Experiment overall
Air-cooled generator set tightness test
Air flotation machine acceptance
Engine performance acceptance
Clean coal acceptance
Gas power generation double super unit
GC/MS instrument acceptance


Scope

This standard applies to the specified range of primary fuel characteristics, but is limited to combined cycle, that is, power generation systems using gas turbines and steam turbines. The boundary of the entire IGCC unit defined in this standard includes three main parts: air separation unit (ASU, for gasifiers using oxygen gasification, or for units using nitrogen); gasification unit (including gas purification); power island . Tests conducted in accordance with this standard determine the quantity and quality of fuel gas, including flow rate, temperature, pressure, composition, calorific value and pollutant content. Pollutants generally refer to compounds that are harmful to gas turbines and power islands, or the original compounds of harmful substances emitted through the chimney. The pollutants to be measured are sodium (Na), potassium (K), vanadium (V), lead (Pb), calcium (Ca), barium (Ba), manganese (Mn), phosphorus (P), sulfide (HS) and COS), nitrogen compounds (HCN and NH), chlorides (HC1) and particulate matter. It is recommended that the pre-test agreement should include test procedures, instrument types, measurement methods, calculation methods and test report contents. The adjustment test of IGCC units is not within the scope of this standard.

Sample only — not a preview of DL/T 1223-2013
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend