DL/T 1898-2018 in English
VALIDTesting specifications for smart substation monitoring and control system
- Issued on:2018-12-25
- Implemented on:2019-05-01
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$460.00
$447.00
$447.00
Introduction
This document specifies the technical requirements and test methods for the monitoring system of smart substations. It covers aspects such as system functions, performance indicators, communication protocols, and data accuracy. The content includes detailed procedures for functional testing, compatibility verification, and performance evaluation under various operating conditions. The standard also outlines the requirements for test environments, equipment, and personnel qualifications. It provides guidance on the preparation of test plans, the execution of tests, and the documentation of test results. This document is applicable to the development, testing, and commissioning of monitoring systems in smart substations, ensuring that they meet the necessary quality and reliability standards. The information provided supports the consistent application of testing procedures across different projects and organizations within the industry.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of DL/T 1898-2018

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 2360-2021 in English
Technical guideline of welding repair for seal surfaces of valve
2021-12-22