Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
limestone-gypsum wet flue gas desulphurisation systems limestone-gypsum wet flue gas desulfurization systems system outages introductionthis standard equipment protection system isolation regeneration flue gas graphitization degree scopethis document single squirrel cage induction motor
DL/T 2125-2020 in English

DL/T 2125-2020 in English

VALID

Directive for the protection of limestone-gypsum wet flue gas desulphurisation systems pertaining to system outages

  • Issued on:2020-10-23
  • Implemented on:2021-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00


Introduction

This standard provides guidance on the procedures and measures for the shutdown and protection of limestone-gypsum wet flue gas desulfurization systems. It outlines the key steps involved in safely shutting down such systems to prevent damage and ensure operational readiness for future use. The document covers aspects such as system isolation, equipment protection, and maintenance requirements during the shutdown period. It also includes recommendations for monitoring and documentation to support effective system management. The content is structured to assist operators and engineers in implementing appropriate practices for system shutdown and protection.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 2125-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 801-2010 in English

    DL/T 801-2010 in English

    Requirements for internal cooling water quality and its system in large generators

    2011-01-09
  • DL/T 790.11-2001 in English

    DL/T 790.11-2001 in English

    Distribution Automation Using Distribution Line Carriers Part 1: General Part 1: Architecture of Distribution Automation Systems

    2001-12-26
  • DL/T 646-1998 in English

    DL/T 646-1998 in English

    Technical specification of manufacturing steel transmission pole structures

    1998-03-19
  • DL/T 5865-2023 in English

    DL/T 5865-2023 in English

    Technical guide for power compartment of utility tunnel

    2023-10-11