Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
general plan transportation design technical code fossil fuel power plants plant general planning plant general plane arrangement gps matrix model bibliography handspike restoration material
DL/T 5032-2005 in English

DL/T 5032-2005 in English

ABOLISHED

Technical Code of General Plan Transportation Design for Fossil Fu

  • Issued on:2005-02-14
  • Implemented on:2005-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $700.00
$679.00


This code specifies the basic technical requirements in general plan transportation design for fossil fuel power plants.
This code is applicable to turbine generator unit capacity 125MW~600MW condensing fossil fuel power plants, as well as heat supply plant unit capacity 50MW or higher level thermal power plants. The code may also be used as reference for 600MW or higher level plant units.
This code is also applicable to designs for power plant construction or extension, and may be used as reference for reconstruction engineering design.

Foreword
1. Scope
2. Normative References
3. General Provisions
4. Plant General Planning
4.1 General Provisions
4.2 Whole Plant Planning
5. Plant General Plane Arrangement
5.1 General Provision
5.2 Arrangement of Main Buildings and Structures
5.3 Auxiliary Workshop Building and Subsidiary Buildings
5.4 Plant Administrative Management and Service Facilities
5.5 Enclosing Wall and Passageway
5.6 Site Treatment
5.7 Building and Structure Spacing
6. Vertical Arrangement
6.1 General Provisions
6.2 Designed Elevation Identification
6.3 Ladder Arrangement
6.4 Field Drainage
6.5 Earth and Stone Work
7. Pipeline Comprehensive Arrangement
7.1 General Provisions
7.2 Underground Pipeline
7.3 Aboveground Piping
8. Transportation
8.1 General Provisions
8.2 Railway
8.3 Road
8.4 Waterway
8.5 Transportation and Weighing Equipment
9. Greening Design
9.1 General Regulations
9.2 Greening Design
9.3 Tree Species Selection
10. Technical and Economic Targets
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.