DL/T 5103-2012 in English
VALIDTechnical code for the design of 35 kV-220 kV unattended substation
- Issued on:2012-01-04
- Implemented on:2012-03-01
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$500.00
$485.00
$485.00
本标准由国家能源局2012年第1号公告批准发布,自2012年3月1日起实施。原《35kV~220kV无人值班变电站设计技术规程》DL/T 5103-1999同时废止。
本标准适用于新建的35kV~220kV无人值班变电站或开关站的设计。
Introduction
This standard provides guidelines for the design of unattended substations operating within the voltage range of 35kV to 220kV. It outlines the necessary technical specifications and operational requirements to ensure the safe and efficient functioning of such substations. The document covers aspects such as site selection, layout planning, equipment selection, and control systems. It also includes provisions for communication systems, automation, and remote monitoring. The standard aims to establish a uniform approach to the design process, facilitating the implementation of reliable and cost-effective solutions. Additionally, it addresses the integration of modern technologies to enhance the performance and maintainability of the substations.
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5458-2012 in English
Regulations for content and depth of detailed design of substation project
2012-11-09