Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
key equipment gis equipment installation main control items electric equipment gis equipment inspection old equipment oil-free equipment inspection rubber bag circuit test boards waistcoat
DL/T 5161.2-2018 in English

DL/T 5161.2-2018 in English

VALID

Specification for construction quality checkout and evaluation of electric equipment installation-Part 2:High voltage electric power equipment

  • Issued on:2018-12-25
  • Implemented on:2019-05-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $580.00
$563.00
Standard No: DL/T 5161.2-2018
Document status: VALID
Title in English: Specification for construction quality checkout and evaluation of electric equipment installation-Part 2:High voltage electric power equipment
Title in Chinese: 电气装置安装工程质量检验及评定规程 第2部分:高压电器施工质量检验
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2018-12-25
Implemented on: 2019-05-01
Superseding: DL/T 5161.2-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 2: High voltage electric power equipment
Professional Classification: DL-Electricity
Related Keywords: key equipment gis equipment installation main control items
electric equipment
gis equipment inspection
old equipment
oil-free equipment inspection
Related Topics: quality inspection
Engineering Quality
Xishuang Engineering Electrical Equipment
Engineering electrical installation
quality inspection
Electrical installation works
electrical installation
Electrical installation works
Regulations for Quality Inspection and Evaluation of Electrical Installation Engineering
Electrical Installation Engineering Quality Inspection
Electrical Installation Engineering High Voltage Electrical
Construction and acceptance of installation engineering of electrical installations in power distribution system
Regulations for quality inspection and assessment of wind farm construction and installation
Construction Quality Inspection and Evaluation Regulations for Yellow River Flood Control Projects
Food quality inspection | Building materials quality inspection | General machinery quality inspection | Electronic appliances quality inspection | Chemical energy quality inspection | Electromechanical light industry inspection
Municipal electrification project construction and quality acceptance
Quality acceptance and assessment of power substation projects
Quality inspection standards for electric water boilers
Electrical installation installation engineering testing group
Air volume measuring device inspection


Introduction

Core changes in the standard revision

2002 Edition2018 EditionTechnological evolution
Inspection of hydraulic operating mechanismCancellation of this itemAdapting to the trend of oil-free equipment
Inspection of no expansion jointNew special inspectionStrengthening seismic requirements for GIS equipment
Inspection of valve type lightning arresterCancellation of related itemsElimination of old equipment types
Foundation grounding requirementsAddition of fence disconnection inspectionImprovement of anti-electric shock protection

Key points for acceptance of key equipment

GIS equipment installation

Main control items:
  • Gas chamber pre-filled gas pressure value deviation ≤5%
  • SF6 gas water content ≤150μL/L (handover value)
  • Segmented loop resistance test requires the 100A DC voltage drop method

SF6 circuit breaker commissioning

Typical case: The measured B-phase loop resistance of a 500kV substation exceeded the standard. Upon inspection, it was found that the silver plating of the contacts was worn. After replacing the contacts, the resistance dropped from 55μΩ to 28μΩ (the standard requirement is ≤40μΩ)

Implementation suggestions

  1. During the transition period between the old and new standards, the interlocking test of the "five-prevention" function should be checked.
  2. It is recommended to use a laser leak detector to test the sealing of GIS.
  3. Vibration spectrum analysis and recording should be added when installing dry-type reactors.

Sample only — not a preview of DL/T 5161.2-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 646-1998 in English

    DL/T 646-1998 in English

    Technical specification of manufacturing steel transmission pole structures

    1998-03-19