Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
fossil-fired power plant introductionthis standard information system coal-fired power plants information systems power generation appearance quality control heat transfer fluids appendix d occupational acute nickel carbonyl
DL/T 5456-2012 in English

DL/T 5456-2012 in English

VALID

Technical Code for the Design of Information System of Fossil-fired Power Plant

  • Issued on:2012-08-23
  • Implemented on:2012-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $660.00
$641.00

本标准共分9章,主要内容包括:总则,术语,总体规划,功能,软件,硬件,接口,信息安全,布置与安装。本标准附条文说明。
本标准适用于采用直接燃烧方式、主要燃用化石燃料的火力发电厂新建、改扩建工程的信息系统设计。
本规范面向相关工程设计、施工及验收单位,相关工程的工作人员。


Introduction

This standard provides guidelines for the design of information systems in coal-fired power plants. It outlines the principles and requirements for the planning, construction, and operation of such systems. The standard covers aspects such as system architecture, data management, communication protocols, and integration with existing infrastructure. It also specifies the necessary functions and performance criteria to ensure the reliability and efficiency of information systems within these facilities. The content is structured to support the implementation of standardized practices in the field of power generation. The standard is applicable to the design phase of new or renovated coal-fired power plants.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 5456-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 2673-2023 in English

    DL/T 2673-2023 in English

    Guide for power grid and source coordination verification test

    2023-10-11
  • DL/T 790.11-2001 in English

    DL/T 790.11-2001 in English

    Distribution Automation Using Distribution Line Carriers Part 1: General Part 1: Architecture of Distribution Automation Systems

    2001-12-26