Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
static var compensator projects introductionthis standard series compensator station construction budget static var compensators budget items mass overlap oilfield water injection scopethis specification applies dust explosion requirements
DL/T 5477-2013 in English

DL/T 5477-2013 in English

VALID

Guidelines for Item Segregation of Construction Budget for Series Compensator Station and Static Var Compensator Projects

  • Issued on:2013-06-08
  • Implemented on:2013-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $210.00
$204.00
Standard No: DL/T 5477-2013
Document status: VALID
Title in English: Guidelines for Item Segregation of Construction Budget for Series Compensator Station and Static Var Compensator Projects
Title in Chinese: 串联补偿站及静止无功补偿工程建设预算项目划分导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2013-06-08
Implemented on: 2013-10-01
Professional Classification: DL-Electricity
Related Keywords: static var compensator projects introductionthis standard
series compensator station
construction budget
static var compensators
budget items
Related Topics: compensate
Static Var Compensation Device System Design and Application Guidelines
dose compensation
negotiated compensation
Environmental Compensation
Guidelines for the division of waste-to-energy project construction budget items
Environmental Compensation
What does the project budget include?
Tube+Compensation+Peak
Concatenation of 48 exceptions
Compensable parts
surface project budget
air compensation
Infrared compensation sheet
compensation operation
Infrared Compensation
Compensation wire precautions
beads adjustment compensation
Calcein-AM/PI Compensation


Introduction

This standard provides guidance on the classification of budget items for the construction of series compensation stations and static var compensators. It outlines the framework for project categorization, ensuring consistency in budgeting processes. The document defines the scope and structure of budget items, facilitating effective planning and execution. It includes detailed provisions for various aspects of project development, such as equipment installation, system integration, and operational readiness. The standard aims to enhance clarity and standardization in budgeting activities related to these engineering projects. It serves as a reference for planners, engineers, and project managers involved in the development and implementation of such projects.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 5477-2013
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL 5073-1997 in English

    DL 5073-1997 in English

    Code for seismic design of hydraulic structures

    1997-08-04