Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
multiple abnormal operation special operation modes special operations out-of-step operation asynchronous operation gas chromatography method introductionthis standard current-voltage characteristics test intensity assessment
DL/T 970-2005 in English

DL/T 970-2005 in English

SUPERSEDED

Guide for abnormal and special operations and maintenances of large turbo-generators

  • Issued on:2005-11-28
  • Implemented on:2006-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $120.00
$117.00
Standard No: DL/T 970-2005
Document status: SUPERSEDED
Superseded by: DL/T 970-2023 Guide for abnormal and special operations and maintenances of large turbo-generators
Superseded on: 2024-04-11
Title in English: Guide for abnormal and special operations and maintenances of large turbo-generators
Title in Chinese: 大型汽轮发电机非正常和特殊运行及维护导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2005-11-28
Implemented on: 2006-06-01
ICS Classification: 29.160.20-Generators
Chinese Classification: K20-Electric rotating machinery in general
Professional Classification: DL-Electricity
Related Keywords: multiple abnormal operation
special operation modes
special operations
out-of-step operation
asynchronous operation
Related Topics: dynamo
generator standard
dl/t954-2005
mt/t 970-2005
DL T954 2005
DL+T954+2005
turbo generator
normal delivery industry
Synchronous generator operates normally


1 Scope

This standard specifies permissible limit of multiple abnormal operation and special operation modes of turbo-generator as well as the relevant maintenance and overhaul measures.

This standard is applicable to turbo-generator with capacity of 300 MW and above and applies to units with other capacities. As for generator having already been put into service but failing to fully meet the requirements of this standard, operating conditions may be determined for the unsatisfied provisions based on the actual situation and by reference to this standard.

2 Normative References

The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments (excluding corrections), or revisions, of any of these publications do not apply to this standard. However parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies.

GB 755-2000 Rotating Electrical Machines - Rating and Performance (idt IEC60034-1: 1996)
GB/T 7064-2002 Requirements for Turbine Type Synchronous Machine (neq IEC 60034-3: 1988)
GB/T 14285 Technical Code for Relaying Protection and Security Automatic Equipment

3 Terms and Definitions

For the purposes of this standard, the following terms and definitions apply.

Foreword i
1 Scope
2 Normative References
3 Terms and Definitions
4 Technical Requirements
4.1 Leading Phase Operation
4.2 Out-of-step Operation
4.3 Asynchronous Operation with Excitation Loss
4.4 Frequency Abnormality
4.5 Three-phase Asymmetric Operation
4.6 Peak Load Regulating Operation

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend