Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
adequate core cooling cold shutdown adequate cooling monitoring instruments instrumentation requirements educational level introduction interpretation liquid extraction resin-impregnated modified wood
GB/T 13632.2-2006 in English

GB/T 13632.2-2006 in English

VALID

Measurements for monitoring adequate cooling within the core of pressurized light water reactors-Part2:Instrumentation requirements during cold shutdown

  • Issued on:2006-03-02
  • Implemented on:2006-08-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $270.00
$262.00
Standard No: GB/T 13632.2-2006
Document status: VALID
Title in English: Measurements for monitoring adequate cooling within the core of pressurized light water reactors-Part2:Instrumentation requirements during cold shutdown
Title in Chinese: 监督压水堆堆芯充分冷却的测量要求 第2部分:冷停堆期间监测仪表的要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2006-03-02
Implemented on: 2006-08-01
ICS Classification: 27.120-Nuclear energy engineering
Chinese Classification: F82-Nuclear instrument for reactor
Professional Classification: GB-National Standard
Related Keywords: adequate core cooling
cold shutdown
adequate cooling
monitoring instruments
instrumentation requirements
Related Topics: Monitor Third Class Requirements
PWR
Core
Supervision instrument
Monitoring instrument
capacity monitor
Monitoring instrument
heap
GB/T 13632.2
GB/T 13632.2-2006
space heap
Edible oil stacking requirements
How to monitor water level with pressure gauge
Monitoring stop testing
Pressurized Water Reactor Standard

《GB/T 13632.2-2006监督压水堆堆芯充分冷却的测量要求 第2部分:冷停堆期间监测仪表的要求》由TC30(全国核仪器仪表标准化技术委员会)归口,TC30SC2(全国核仪器仪表标准化技术委员会反应堆仪表分会)执行,主管部门为国家标准化管理委员会。
GB/T 13632本部分规定了冷停堆芯充分冷却监测仪表的要求,考虑了冷停堆期间为了维修将反应堆压力容器内水位降低的工况下对仪表的具体要求,以保证堆芯充分冷却。


Scope

This part specifies the requirements for monitoring instruments for adequate core cooling during cold shutdown. This section is applicable to the design of core cooling monitoring instruments when designing or modifying configurations similar to those shown in Figure 1 and Figure 2 (hereinafter referred to as PWR).

Sample only — not a preview of GB/T 13632.2-2006
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 15474-2010 in English

    GB/T 15474-2010 in English

    Classification on instrumentation and control function important to safety for nuclear power plants

    2010-11-10