Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
safety operation introduction key points crane-type pile driver ≥6 times safety factor normativeness hydraulic pile hammer control single point operation multiple impact pile driver code pile hammer acephate original drug internal combustion engines-large diameter piston cephalopod snack foods
GB/T 13749-2022 in English

GB/T 13749-2022 in English

VALID

Impact pile driver—Code of practice of safety operation

  • Issued on:2022-10-12
  • Implemented on:2023-05-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: GB/T 13749-2022
Document status: VALID
Title in English: Impact pile driver—Code of practice of safety operation
Title in Chinese: 冲击式打桩机 安全操作规程冲击式打桩机 安全操作规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2022-10-12
Implemented on: 2023-05-01
Superseding: GB/T 13749-2003 Diesel pile driver―Safety operation rules
ICS Classification: 91.220-Construction equipment
Chinese Classification: P97-Architectural engineering construction machinery
Professional Classification: GB-National Standard
Related Keywords: safety operation introduction key points
crane-type pile driver ≥6 times safety factor
normativeness hydraulic pile hammer control single point operation multiple
impact pile driver code
pile hammer
Related Topics: Impact Performance Regulations
pile driver
Impact testing machine work
beat
Early attack
Early attack
pile
How Impact Testing Works
hit
Voltammetric Polarography Operating Instructions
Operating instructions for voltammetry polarograph
Pile Driver Safety Regulations
GBT13749
GB/T 13749-2003
GB/T 13749-2022
Film spinning machine operating procedures
Air pressure safety test operating procedures
CNC drilling machine operating procedures
Safety operating procedures for automatic locking screw machines
Operating Procedures for Shock-type Standard Vibrating Screening Machine
Safe operation of planetary ball mill
Shock wave overpressure safety
Drop weight impact testing machine operating procedures
Impact safety of equipment
gb/t 13749-2022

《GB/T 13749-2022冲击式打桩机 安全操作规程》由TC328(全国建筑施工机械与设备标准化技术委员会)归口,TC328SC2(全国建筑施工机械与设备标准化技术委员会基础施工设备分会)执行,主管部门为中国机械工业联合会。


Introduction

Key points of standard evolution and technology upgrade

Technical dimension 2003 edition 2022 new edition Upgrade range
Wire rope safety system Specific coefficient not specified Crane-type pile driver ≥6 times safety factor ↑300% normativeness
Hydraulic pile hammer control Single point operation Multiple interlocking control + accumulator monitoring ↑Safety level
Surface operation specifications No special clauses 7 new operational requirements ↑Risk coverage rate

Analysis of core technical specifications

Key equipment operation points

The new diesel pile hammer must follow: 1.5-2.5 times stroke preheating → intelligent throttle adjustment → emergency stop three-level safety control mechanism. The water cooling system clearly limits the cooling water hardness to ≤50mg/L to ensure heat dissipation efficiency.

Solutions for extreme working conditions

Case: During the typhoon warning period, operations must simultaneously implement triple fixing measures: ①Hanging hammer limit lock ②Main structure counterweight 120% ③Dual redundant anchoring system

Safety guarantee for special operations

Dual control system for surface piling

  • Dynamic ship stabilization indicators:Roll angle ≤5°|Pitch angle ≤3°|Positioning accuracy ±1m
  • Synchronous operation procedures:Main crane-auxiliary crane load ratio ≤3:1|Closing translation rate ≤0.5m/s

Warning threshold for high-risk operations

Monitoring parameters Level 1 warning Level 2 alarm Emergency shutdown
Pile inclination 1.5% 2% ≥2.5%
Hydraulic oil temperature 75℃ 85℃ ≥95℃

Implementation suggestions and innovative development

Standardization upgrade path

  1. Establish an intelligent equipment monitoring platform, integrating online monitoring of wire rope stress + hammer energy feedback system
  2. Develop a digital operation cockpit to achieve online traceability and risk assessment of operating parameters

Technical innovation direction

Explore the application of composite material shock-absorbing base + 5G remote synchronous control system to improve the safety and efficiency of ultra-deep pile construction

Sample only — not a preview of GB/T 13749-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend