Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
static vacuum insulated cryogenic pressure vessel cryogenic pressure cryogenic vessel fabrication requirements basic fabrication requirements satellite technology elements barium patient experience investigation
GB/T 18442.4-2011 in English

GB/T 18442.4-2011 in English

SUPERSEDED

Static vacuum insulated cryogenic pressure vessel—Part 4:Fabrication

  • Issued on:2011-11-21
  • Implemented on:2012-05-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $130.00
$127.00

《GB/T 18442.4-2011固定式真空绝热深冷压力容器 第4部分:制造》由TC262(全国锅炉压力容器标准化技术委员会)归口,TC262SC8(全国锅炉压力容器标准化技术委员会低温容器分会)执行,主管部门为国家标准化管理委员会。


1 Scope

1.1 This part specifies the basic fabrication requirements of Static Vacuum Insulated Cryogenic Pressure Vessel (hereinafter referred to as "cryogenic vessel").
1.2 The application scope in this part is the same as that in part 1 of this standard.

2 Normative References

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendment) applies.

Contents
Foreword I
1 Scope
2 Normative References
3 Terms and Definitions
4 General Requirements
5 Material Preparation
6 Cold and Hot Forming
7 Fabrication Requirements
8 Welding
9 Product Weld Test Plate
10 Cleaning and Assembling
11 Helium Mass Spectrum Leak Detection
12 Pipeline Fabrication and Installation of Safety Accessories
13 Non-destructive Testing
14 Coating and Appearance Quality
15 Mark and Sign
16 Delivery Documents
17 Delivery Conditions

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.