Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
function test noise level determination unit durability test unit vibration test unit performance test aerodynamic characteristics test test site test conditions spearmint oil waxes scope1.1 salte deposit exploration
GB/T 19068.2-2017 in English

GB/T 19068.2-2017 in English

VALID

Small wind turbines-Part 2: Test method

  • Issued on:2017-11-01
  • Implemented on:2018-05-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00
Standard No: GB/T 19068.2-2017
Document status: VALID
Title in English: Small wind turbines-Part 2: Test method
Title in Chinese: 小型风力发电机组 第2部分:试验方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2017-11-01
Implemented on: 2018-05-01
Superseding: GB/T 19068.2-2003 Off-grid wind turbine generator system - Part 2: Test method
ICS Classification: 27.180-Wind turbine systems and other alternative sources of energy
Professional Classification: GB-National Standard
Related Keywords: function test noise level determination unit durability test unit vibration test
unit performance test
aerodynamic characteristics test
test site
test conditions
Related Topics: generator set
the wind
small nuclear power generation
Large wind turbines are
Wind Turbine
GB/T 19068.2
GB/T 19068.2-2003
GB/T 19068.2-2017
Small tensile machine test
Wind turbine tubular busbar
Small molecule liquid phase method development
Test methods for synchronous motors of wind turbines

《GB/T 19068.2-2017小型风力发电机组 第2部分:试验方法》由TC50(全国风力发电标准化技术委员会)归口,主管部门为中国机械工业联合会。


Introduction

GB/T 19068.2—2017 Standard Overview

This standard specifies the test conditions and test methods for small wind turbines (hereinafter referred to as "units"), and is applicable to the testing of small horizontal axis wind turbines for grid-connected or off-grid applications with a rotor swept area of less than $200~\mathrm{m^{2}}$ and a generated voltage lower than $1000\mathrm{~V}$ for AC or $1500\mathrm{~V}$ for DC.


Background of Standardization and Technological Evolution

GB/T 19068.2—2017 is a revision of GB/T 19068.2—2003. The main changes include:

  • Expanded the scope of application
  • Added requirements for the location of wind towers in the test site
  • Added requirements for site calibration and measurement sectors
  • Added content of blade static balance and blade tip axial runout tests
  • Modified the content of unit power characteristic tests
  • Added content of durability tests and vibration tests and evaluations

Test conditions and instrument requirements

The test site should meet the following requirements:

Parameters Requirements
Annual average wind speed greater than $5~\mathrm{m/s}$
Maximum wind speed not less than $20~\mathrm{m/s}$
Location of wind tower $2D\sim4D$ from the unit, a distance of $2.5D$ is recommended

The instruments and meters used in the test should be within the validity period of the inspection and approval by the metrology department, and one secondary calibration source (instrument manufacturer or standard laboratory) is allowed to conduct calibration.


Aerodynamic characteristics test

The aerodynamic characteristics test includes the following steps:

  • Directional performance measurement
  • Unit cut-in wind speed measurement
  • Rotor aerodynamic characteristics measurement
  • Rotor mechanical output characteristics determination

Among them, the rotor torque $M$ can be calculated by the rotor rotation inertia $J$, the formula is:

$$ M=J\varepsilon $$

Unit performance test

The unit performance test includes the following contents:

  • Power characteristics test
  • Annual energy production (AEP) calculation
  • Power factor measurement
  • Safety and function test
  • Noise level determination
  • Unit durability test
  • Unit vibration test and evaluation

Implementation recommendations

Based on the standard content, it is recommended that:

  • Strictly select the test site in accordance with the standard requirements to ensure that the wind speed and terrain conditions meet the requirements
  • Use high-precision instruments for measurement and calibrate the equipment regularly
  • Record all data during the test and perform detailed uncertainty analysis
  • For battery packs with different voltage setting values, collect additional characteristic data to quantify their impact

Sample only — not a preview of GB/T 19068.2-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend