GB/T 25919.1-2010 in English
VALIDModbus test specification—Part 1:Modbus conformance test specification over serial link
- Issued on:2011-01-14
- Implemented on:2011-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$291.00
| Standard No: | GB/T 25919.1-2010 |
| Document status: | VALID |
| Title in English: | Modbus test specification—Part 1:Modbus conformance test specification over serial link |
| Title in Chinese: | Modbus测试规范 第1部分:Modbus串行链路一致性测试规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2011-01-14 |
| Implemented on: | 2011-05-01 |
| ICS Classification: | 25.040-Industrial automation systems |
| Chinese Classification: | N10-Industrial automation and control device in general |
| Professional Classification: | GB-National Standard |
| Related Keywords: | modbus conformance test specification
serial link modbus sub-equipment serial link conformance test system serial link scopethis part modbus sub-equipment |
| Related Topics: | serial test english
serial test english test chain modbus GB/T 25919.1 GB/T 25919.1-2010 Test specifications in English |
《GB/T 25919.1-2010Modbus测试规范 第1部分:Modbus串行链路一致性测试规范》由TC124(全国工业过程测量控制和自动化标准化技术委员会)归口,主管部门为中国机械工业联合会。
Scope
This part is mainly for serial link Modbus sub-equipment, and its purpose is to confirm the compliance of Modbus sub-equipment with GB/T 19582.2-2008. This section applies to industries, transportation, electric power, building control and other fields. This part specifies the structure and test method of the Modbus serial link conformance test system.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 47014.3-2026 in English
Industrial communication networks—Fieldbus specifications—Type 2 elements: EtherNet/IP,ControlNet and DeviceNet specifications—Part 3: Applicatoin layer service definition
2026-01-28 -

GB/T 32235.2-2024 in English
Industrial process measurement, control and automation—Digital factory framework—Part 2: Model elements
2024-08-23 -

GB/T 20171-2006 in English
EPA system architecture and communication specification for use in industrial control and measurement systems
2006-05-08 -

GB/T 42126.1-2022 in English
Industrial wireless communication specification based on cellular networks—Part 1:General technical requirements
2022-12-30 -

GB/T 41771.11-2025 in English
Field device integration—Part 11: Profiles—PROFIBUS
2025-10-31 -

GB/T 41157.3-2022 in English
Fasteners for nuclear power plants—Part 3:Bolts, screws and studs made of corrosion-resistant stainless steel
2022-03-09 -

GB/Z 21099.6-2018 in English
Function blocks(FB) for process control and electronic device description language(EDDL)—Part 6:Meeting the requirements for integrating fieldbus devices in engineering tools for field devices
2018-06-07 -

GB/T 29910.1-2013 in English
Industrial communication networks―Fieldbus specifications―Type 20 HART specification―Part 1: HART wired network physical layer service definition and protocol specification
2013-12-17 -

GB/T 30976.1-2014 in English
Industrial control system security―Part 1:Assessment specification
2014-07-24 -

GB/T 25740.1-2013 in English
PROFIBUS & PROFINET Technical Profile Profidrive - Part 1: Profile Specifications
2013-12-31