Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
remote laboratory review remote review core review principles principles technical requirements implementation cases convenience technical specifications remote assessment common data classes scopethis part cryogenic pipe scopethis standard aseptic cold
GB/T 27432-2025 in English

GB/T 27432-2025 in English

VALID

Technical specifications for remote assessment of laboratory

  • Issued on:2025-02-28
  • Implemented on:2025-02-28
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $270.00
$262.00
Standard No: GB/T 27432-2025
Document status: VALID
Title in English: Technical specifications for remote assessment of laboratory
Title in Chinese: 实验室远程评审技术规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2025-02-28
Implemented on: 2025-02-28
ICS Classification: 03.120.20-Product and company certification. Conformity assessment
Chinese Classification: A00-Standardization and Quality Management
Professional Classification: GB-National Standard
Related Keywords: remote laboratory review
remote review
core review principles principles technical requirements implementation cases convenience
technical specifications
remote assessment
Related Topics: review
Technology Center Laboratory
Review time
remote risk
laboratory review
Surface Technology Laboratory
Evaluation laboratory
site lab
Four only review
lab process
Laboratory management review basis
Remote Imaging Technology
Laboratory Specifications
laboratory technical level
Evaluation of experimental techniques
Measured and measured technical regulations

《GB/T 27432-2025实验室远程评审技术规范》由TC261(全国认证认可标准化技术委员会)归口,主管部门为国家标准委。


Introduction

Standard Framework and Technology Evolution

As the first special standard for remote laboratory review in my country, this specification marks an important transformation from the traditional on-site review mode to digital review. The standard is compiled based on the application background of new technologies such as 5G communication and cloud computing, and refers to the requirements of six international documents such as IAF MD 4:2018.


Analysis of core review principles

Principles Technical requirements Implementation cases
Convenience and equivalence It is necessary to ensure that the conclusions of remote review are equivalent to those of on-site review The high-altitude laboratory uses 360° panoramic camera to achieve environmental verification
Information security Complies with the encrypted transmission requirements of YD/T1737 Use the national secret algorithm SM4 to encrypt video streams
Risks are controllable Establish a three-level risk warning mechanism Initiate emergency plan when network delay > 200ms

Detailed explanation of ICT technical requirements

Hardware configuration standards

The specification clearly requires that the camera resolution be ≥ 1.3 million pixels (1280×960dpi). In actual applications, it is recommended to use a 4K pan-tilt camera in combination with a sound pickup array to clearly capture the details of the experimental operation.

Software Function Matrix

  • Basic functions:Video conferencing (support ≥3-party access), screen sharing, file transfer
  • Enhanced functions:Experimental process marking (timestamp positioning), multi-view switching, digital watermark

Key nodes of the implementation process

  1. Pre-debugging phase:Bandwidth test (≥50Mbps) and equipment compatibility verification need to be completed
  2. Technical capability confirmation:Adopt "dual-channel verification" mode (real-time video + process recording)
  3. Evidence preservation:Electronic materials need to retain original metadata, and the storage period is ≥3 years

Risk prevention and control implementation suggestions

For common risk scenarios, it is recommended to establish:

Risk type Prevention and Control Measures Detection Indicators
Data Tampering Blockchain Evidence Storage Technology Hash Value Verification Matching Rate 100%
Identity Impersonation Dynamic Iris Recognition Biometric False Recognition Rate≤0.001%
Network Interruption 5G/WiFi6 Dual-Link Backup Switching Delay≤300ms

Sample only — not a preview of GB/T 27432-2025
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/Z 27426-2022 in English

    GB/Z 27426-2022 in English

    Guidance on monitoring validity of the results for chemical analysis laboratory

    2022-10-12
  • GB/T 27060-2025 in English

    GB/T 27060-2025 in English

    Conformity assessment—Code of good practice

    2025-02-28
  • GB/T 22275.8-2026 in English

    GB/T 22275.8-2026 in English

    Requirements of conduct for good laboratory practice—Part 8: The application of cloud computing used in GLP laboratory

    2026-05-25
  • GB/T 22272-2008 in English

    GB/T 22272-2008 in English

    Advisory document for good laboratory practice : Establishment and control of archives that operate in compliance with the principles of GLP

    2008-08-04
  • GB/T 27011-2019 in English

    GB/T 27011-2019 in English

    Conformity assessment—Requirements for accreditation bodies accrediting conformity assessment bodies

    2019-12-31