Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
nuclear power plant nuclear power plants nuclear piping nuclear island pre-operation test stage verification requirement sustainability ferromagnetic material samples interferometric methane detectors
GB/T 28550-2012 in English

GB/T 28550-2012 in English

VALID

Piping verification requirement during nuclear power plant commissioning

  • Issued on:2012-06-29
  • Implemented on:2012-11-01
  • File Format:PDF
  • Delivery:Within 1 day
Price(USD): $88.00
$86.00
Standard No: GB/T 28550-2012
Document status: VALID
Title in English: Piping verification requirement during nuclear power plant commissioning
Title in Chinese: 核电厂调试阶段管道验证要求
Language: English
File Format: Electronic (PDF)
Delivery: Within 1 day
Issued on: 2012-06-29
Implemented on: 2012-11-01
ICS Classification: 27.120.99-Other standards related to nuclear energy
Chinese Classification: F24-Electric power testing technique
Professional Classification: GB-National Standard
Related Keywords: nuclear power plant
nuclear power plants
nuclear piping
nuclear island pre-operation test stage
verification requirement
Related Topics: debugging
nuclear power
nuclear power standards
pipeline gb
road stage
External Validation Requirements
verification requirements
Instrument debugging stage
GBT28550
GB/T 28550-2012
Nuclear power air conditioner
Nuclear power air conditioning standards
Nuclear power plant main circuit hydraulic pressure test
Air conditioning requirements for nuclear power
verify
t 28548

《GB/T 28550-2012核电厂调试阶段管道验证要求》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。


Scope

This standard specifies the verification methods and requirements for primary circuit nuclear piping during commissioning of PWR nuclear power plants. This standard is applicable to the piping verification of the nuclear island pre-operation test stage of the pressurized water reactor nuclear power plant, and non-pressurized water reactor nuclear power plants can refer to it for implementation.

Sample only — not a preview of GB/T 28550-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend