Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
prestressed concrete cylinder pipelines scopethis standard cathodic protection cathodic protection system reinforced concrete pipelines prestressed steel cylinder dicyclopentadiene introduction gbz/t electronic parts hot-dipped galvanized steel sheets
GB/T 28725-2012 in English

GB/T 28725-2012 in English

VALID

Cathodic protection for buried prestressed concrete cylinder pipelines

  • Issued on:2012-09-03
  • Implemented on:2013-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $330.00
$321.00

《GB/T 28725-2012埋地预应力钢筒混凝土管道的阴极保护》由TC381(全国腐蚀控制标准化技术委员会)归口,主管部门为中国石油和化学工业联合会。


Scope

This standard specifies the terms, definitions and abbreviations, requirements, criteria, design, construction and acceptance, operation management, documentation and management of buried prestressed steel cylinder concrete pipeline (hereinafter referred to as PCCP pipeline) cathodic protection system. This standard applies to the cathodic protection of newly built or built buried PCCP pipelines, and other prestressed reinforced concrete pipelines can also be used as a reference.

Sample only — not a preview of GB/T 28725-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend