GB/T 28806-2012 in English
ABOLISHEDRailway applications - Rolling stock - Testing of rolling stock on completion of construction and before entry into service
- Issued on:2012-11-05
- Implemented on:2013-02-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$699.00
《GB/T 28806-2012轨道交通 机车车辆 机车车辆制成后投入使用前的试验》由TC278(全国轨道交通电气设备与系统标准化技术委员会)归口,TC278SC1(全国轨道交通电气设备与系统标准化技术委员会机车车辆电气分会)执行,主管部门为国家铁路局。
Scope
This standard specifies the general criteria for proving that new rail transit vehicles comply with standards or other normative documents through tests. Part or all of this standard applies to all rail transit rolling stock, but does not include special rolling stock, such as track laying machines, ballast cleaners and commuter cars. For special-purpose rolling stock, the scope of application of this standard can be specified in the contract. This standard may be used, if applicable, for: - generating sets installed on rolling stock for auxiliary purposes; - electric drive systems for trolleybuses or similar rolling stock; - control of rolling stock with non-electric traction systems and auxiliary equipment; - rolling stock guided, suspended or electrically propelled by a system not using wheel-rail adhesion.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.