Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
primary frequency control test primary frequency regulation test results disturbance clear interval test load point3 benchmark conditionsadd separate test plan add target value implementation suggestion module test preparation optimization slurry transportation scopethis procedure rear excavator equipment scopethis standard coalbed methane activities
GB/T 30370-2022 in English

GB/T 30370-2022 in English

VALID

Guide of primary frequency control test and performance acceptance for thermal power generating units

  • Issued on:2022-10-12
  • Implemented on:2023-05-01
  • File Format:PDF
  • Delivery:Within 1 day
Price(USD): $176.00
$171.00

《GB/T 30370-2022火力发电机组一次调频试验及性能验收导则》由TC376(全国电站过程监控及信息标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Analysis of dynamic changes in standards

Innovation points2013 version2022 new version
Speed inequalityNo specific range requirement3%-6% clear interval
Test load point3 benchmark conditionsAdd deep peak load condition verification
Response indicatorTotal response time onlySubdivided into lag + stability dual parameters

Analysis of key technical parameters

Frequency measurement accuracy: The new version requires ≤0.003Hz. The test needs to give priority to calibrating the DEH system acquisition module

Dynamic response benchmark: Set 12 key assessment nodes, including the step time limit for reaching 75%/90% of the target value


Implementation suggestion module

Test preparation optimization checklist

  • The DEH/TCS valve flow characteristics must complete the system confidence verification in advance
  • The deep peak regulation mode of the thermal power unit requires a separate test plan
  • Add the steam turbine speed regulation system filter parameter verification step

Typical coal-fired unit primary frequency regulation test results
Disturbance amplitudeResponse time(s)Load deviation control(±%)
±0.067Hz2.70.85
±0.1Hz2.91.12

Sample only — not a preview of GB/T 30370-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 2820.7-2024 in English

    GB/T 2820.7-2024 in English

    Reciprocating internal combustion engine driven alternating current generating sets—Part 7:Technical declarations for specification and design

    2024-08-23
  • GB/T 37089-2018 in English

    GB/T 37089-2018 in English

    Reciprocating internal combustion engine driven alternating current generating sets-Controller

    2018-12-28
  • GB/T 31038-2014 in English

    GB/T 31038-2014 in English

    General technical condition for high voltage diesel-generating sets

    2014-12-05
  • GB/T 2820.1-2022 in English

    GB/T 2820.1-2022 in English

    Reciprocating internal combustion engine driven alternating current generating sets—Part 1:Application,ratings and performance

    2022-12-30