GB/T 31960.11-2016 in English
VALIDTechnical specification of power energy efficiency monitoring system-Part 11:Test specification of power energy efficiency information collection and exchange terminal
- Issued on:2016-04-25
- Implemented on:2016-11-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$204.00
| Standard No: | GB/T 31960.11-2016 |
| Document status: | VALID |
| Title in English: | Technical specification of power energy efficiency monitoring system-Part 11:Test specification of power energy efficiency information collection and exchange terminal |
| Title in Chinese: | 电力能效监测系统技术规范 第11部分:电力能效信息集中与交互终端检验规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2016-04-25 |
| Implemented on: | 2016-11-01 |
| ICS Classification: | 27.010-Energy and heat transfer engineering in general |
| Professional Classification: | GB-National Standard |
| Related Keywords: | power energy efficiency information collection
power energy efficiency power energy efficiency monitoring systems power energy efficiency information concentration energy efficiency monitoring |
| Related Topics: | Efficient detection ability
Monitoring ability is more Set detection monitoring GB/T 31960.11 GB/T 31960.11-2016 Electric Energy Efficiency Energy efficiency monitoring information system project pricing |
《GB/T 31960.11-2016电力能效监测系统技术规范 第11部分:电力能效信息集中与交互终端检验规范》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。
Introduction
GB/T 31960.11—2016 Standard Overview
GB/T 31960.11—2016 is Part 11 of the Technical Specifications for Power Energy Efficiency Monitoring Systems, which is specifically for the inspection specifications for power energy efficiency information concentration and interactive terminals. The standard specifies in detail the laboratory inspection conditions, methods and rules, and involves electromagnetic compatibility tests and safety protection requirements.
Comparison of standard frameworks
| Dimensions | Contents | GB/T 31960.11—2016 requirements | Comparison results |
|---|---|---|---|
| Laboratory test conditions | Climate environment, power supply conditions, test equipment accuracy | - Temperature range: +15°C~+35°C - Relative humidity: 25%~75% - Power supply frequency: 50Hz±2% | Comply with national electrical and electronic product standards and strictly control test conditions. |
| Electromagnetic compatibility test | Anti-interference, electrostatic discharge and other test requirements | - Power frequency magnetic field immunity: 400A/m - Electrostatic discharge immunity: 8kV (10 times each for positive and negative poles) - Fast transient pulse group immunity: ±4.0kV | High test requirements to ensure the stability of the equipment in a complex electromagnetic environment. |
| Safety protection | Insulation performance, dustproof, vibration and other tests | - Dielectric strength: 50Hz sine wave voltage for 1 minute without breakdown - Protection level: IP code complies with GB/T4208 standard | Comprehensive safety protection measures to ensure long-term stable operation of the equipment. |
Explanation of professional terms and practical application cases
Glow wire test (650°C~960°C): used to test the flame retardant performance of equipment at high temperatures. For example, a certain brand of terminal passed the test, proving that its shell material has good flame retardant properties.
Continuous power-on stability test (72 hours): Verifies the long-term operation capability of the equipment at rated voltage. The experimental results show that all tested equipment did not experience performance degradation or failure.
Standard formulation background and technology evolution analysis
With the increasing demand for energy efficiency monitoring in power systems, the GB/T 31960 series of standards came into being. Part 11 focuses on the inspection of terminal equipment to ensure its reliability and stability in a complex power grid environment. Compared with the previous version, a number of new electromagnetic compatibility test requirements have been added, and the safety protection level has been improved.
Implementation suggestions
- The laboratory should be equipped with test equipment that meets the standards, such as high-temperature boxes, vibration tables, etc.
- Strictly follow the inspection sequence and sampling plan for arrival acceptance and type inspection.
- Strengthen electromagnetic compatibility testing capabilities to ensure stable operation of equipment in complex power grid environments.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 15913-2022 in English
Monitoring and testing for energy saving of fan's unit and distribute tube system
2022-10-12 -

GB/T 29729-2022 in English
Essential requirements for the safety of hydrogen systems
2022-12-30 -

GB 40877-2021 in English
The norm of energy consumption per unit product of aluminium silicate wools and products
2021-10-11 -

GB/T 31350-2014 in English
Guideline for energy measurement apparatus equipping and management of sintering wall & roof materials enterprise
2014-12-31 -

GB/T 40498-2021 in English
General principles of drafting energy consumption norm standards for public institutions
2021-08-20 -

GB/T 34913-2017 in English
Classification and presentation of civil building energy use
2017-11-01