Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
probabilistic risk assessment single risk assessment method comprehensive assessment risk assessment risk level assessment risk assessment methodology risk assessment methods power safety puffed bean products magnetic thrust bearing
GB/T 34024-2017 in English

GB/T 34024-2017 in English

VALID

Risk assessment methodology for passenger aerial ropeways

  • Issued on:2017-07-12
  • Implemented on:2018-02-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00
Standard No: GB/T 34024-2017
Document status: VALID
Title in English: Risk assessment methodology for passenger aerial ropeways
Title in Chinese: 客运架空索道风险评价方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2017-07-12
Implemented on: 2018-02-01
ICS Classification: 45.100-Cableway equipment
Chinese Classification: J81-Conveying machinery
Professional Classification: GB-National Standard
Related Keywords: probabilistic risk assessment single risk assessment method comprehensive assessment
risk assessment
risk level assessment
risk assessment methodology
risk assessment methods
Related Topics: Risk Assessment
Risk Evaluation Criteria
Risk Assessment
Air Freight Price
risk
Risk Assessment Method
Toxicity Risk Assessment
GBT34024
GB/T 34024-2017
DIN6799 Daoke
gjb6387 Daoke
jgj52 Daoke
GB18884.4 Daoke
YYT1829 Daoke
gjb8875 Daoke
Air transport aerial ropeway installation inspection
There are three risk assessment methods
Risk assessment methods mainly include
Passenger ropeway related

《GB/T 34024-2017客运架空索道风险评价方法》由TC250(全国索道与游乐设施标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

1. Overview and core significance of the standard

GB/T 34024—2017 is my country's first standard specifically for risk assessment of passenger aerial ropeways, filling the gap in standards in this field. Its core is to evaluate and reduce safety hazards of passenger aerial ropeways through a systematic approach to ensure the safety of passengers' lives and property.

2. Comparative analysis of standard frameworks

Standard dimensions GB/T 34024—2017 Compared standards (such as ISO, EN) Advantage analysis
Scope of application All reciprocating and circulating passenger aerial ropeways in use Mainly for specific types of equipment Wide coverage and strong adaptability
Evaluation method Failure mode and effect analysis (FMEA) combined with probabilistic risk assessment Single risk assessment method Comprehensive assessment, more accurate results
Risk management Dynamic iterative evaluation mechanism Static management framework Continuous optimization, significant effect

3. Risk assessment implementation steps

Case study: Risk assessment of a passenger ropeway in a large scenic area

Through actual cases, detailed explanation of how to identify, evaluate and grade risks in accordance with standards. Specifically including:

  • Failure mode analysis: Corrosion of line supports leads to decreased structural strength
  • Severity of consequences: Passengers fall, causing casualties and social panic
  • Failure probability assessment: More likely (Grade B)
  • Risk category: Class IV (immediate mitigation measures must be taken)

4. Risk level assessment and mitigation measures

According to the risk level classification of the passenger aerial ropeway in Table 4, corresponding management strategies are adopted for different levels of risks. For example:

Risk level Assessment criteria Recommended measures
Level 4 (major risk) There is a Class IV risk or more than 8 Class III risks Immediately take mitigation measures and reassess
Level 3 (high risk) No Class IV risk but a large number of Class III risks Take protective measures and conduct regular inspections

5. Implementation suggestions and precautions

To ensure the effective implementation of the standard, the following suggestions are put forward:

  • Staff training: Regularly organize relevant personnel to conduct training on risk assessment methods and tools
  • Data accumulation: Establish complete operation records and maintenance files of the ropeway system
  • Dynamic optimization: Continuously optimize risk management strategies based on assessment results

The above interpretation combines actual application scenarios and provides a scientific basis and operational guidance for the safety management of passenger aerial ropeways.

Sample only — not a preview of GB/T 34024-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend