Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
demand response service system demand response aggregatorparticipate demand response system demand response service system demand response aggregation system demand response service system functional complex fabrics occupational radiation skin injuries quick loosening agent
GB/T 35681-2017 in English

GB/T 35681-2017 in English

VALID

Function specification of power demand response system

  • Issued on:2017-12-29
  • Implemented on:2018-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00

《GB/T 35681-2017电力需求响应系统功能规范》由524(中国电力企业联合会)归口,TC549(全国智能电网用户接口标准化技术委员会)执行,主管部门为中国电力企业联合会。


Introduction

National Standard of the People's Republic of China GB/T 35681—2017

Functional Specification of Electricity Demand Response System

Standard DimensionsGB/T 35681—2017
Scope of ApplicationDesign, development and operation and maintenance of electricity demand response system
Main FunctionsFunctional Specification of Demand Response Service System, Aggregation System and Terminal Equipment
Issuing UnitChina Electricity Council

1. Background and Significance of Standard Formulation

As the proportion of renewable energy in the power grid increases, traditional power systems face load regulation pressure. Demand response technology has become an important means to improve the flexibility and efficiency of the power system by flexibly adjusting user-side loads and optimizing power grid operation.

2. System composition and participants

ParticipantsRoles and responsibilities
Demand response service managerOrganize and implement demand response based on the demand response service system
Demand response aggregatorParticipate in and organize demand response through the aggregation system
Industrial, commercial and residential usersParticipate in demand response through demand response terminals

3. Comparative analysis of standard frameworks

Comparison between GB/T 35681-2017 and GB/T 32672-2016:

  • Expanded functional requirements of demand response system
  • The calculation method of implementation effect has been refined
  • Safety protection measures have been enhanced
  • The application of renewable energy consumption scenarios has been increased

4. Key technical points

4.1 Functional requirements of demand response service system

Functional moduleRequired functions
User managementRegistration, file management, information query
Resource managementRegistration, parameter maintenance, classification management
Project managementDesign, query and maintenance, release

4.2 Functional requirements of demand response aggregation system

The demand response aggregation system is mainly responsible for coordinating the response behaviors of multiple users. Its core functions include:

  • User management: registration, file creation and query
  • Resource management: equipment registration, parameter maintenance and classification
  • Project management: receiving and managing project information of the superior demand response service system, and supporting its own project design

4.3 Functional requirements of demand response terminals

As a key device on the user side, the demand response terminal needs to implement the following:

  • Communication function: information interaction with the superior system and subordinate equipment
  • Data collection: collecting user power load and equipment operation status information
  • Command control: generating and issuing control commands according to event signals
  • Value-added services: energy efficiency management, equipment status monitoring

5. Implementation suggestions

5.1 System design and deployment

Key points:

  • Ensure that the system has good scalability and supports distributed storage and dynamic expansion
  • Strengthen security protection measures and use encryption, signature and other technologies to protect key data
  • Implement simulation and exercise functions to support business simulation and personnel training

5.2 Coordinated implementation with other standards

This standard is closely related to standards such as GB/T 32127 (demand response effect monitoring) and GB/T 32672 (general technical specifications). It is recommended to fully consider the connection and coordination between these standards in practical applications.

5.3 Performance Optimization

According to the standard requirements, the system should meet the following performance indicators:

  • Information monitoring time interval: ≤15 minutes
  • Data storage capacity: ≥1000 users, retention period ≥3 years
  • Support large-scale user access and rapid processing of response events

6. Conclusion

GB/T 35681-2017 standard provides comprehensive technical specifications for the construction and operation of power demand response systems, which is of great significance to improving the flexibility of the power grid and promoting the consumption of renewable energy. It is recommended that relevant companies strictly follow the standard requirements for system design and deployment in actual applications to ensure the integrity of system functions and the reliability of performance.

Sample only — not a preview of GB/T 35681-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.