GB/T 35724-2017 in English
VALIDGuideline for technical and economic evaluation of ocean energy power station
- Issued on:2017-12-29
- Implemented on:2018-07-01
- File Format:PDF
- Delivery:Via email within 5 business days
$592.00
| Standard No: | GB/T 35724-2017 |
| Document status: | VALID |
| Title in English: | Guideline for technical and economic evaluation of ocean energy power station |
| Title in Chinese: | 海洋能电站技术经济评价导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2017-12-29 |
| Implemented on: | 2018-07-01 |
| Chinese Classification: | F14-Ocean energy |
| Professional Classification: | GB-National Standard |
| Related Topics: | power station
economy ocean guide sea of guidelines National Ocean Economic Statistics Marine inductance technical importance Technical Guidelines for Atmospheric Assessment economic evaluation GBT35724 GB/T 35724-2017 technical economy Haineng technical instrument price list Technical manager ability evaluation Photovoltaic economic evaluation Economic Evaluation of Nuclear Power Plants Marine Economic International Marine economic industries in various countries Economic evaluation of photovoltaic power stations |
《GB/T 35724-2017海洋能电站技术经济评价导则》由TC283(全国海洋标准化技术委员会)归口,主管部门为自然资源部(海洋)。
Introduction
Analysis of the Standard Core Framework
| Evaluation Dimensions | Technology Maturity Evaluation | Economic Evaluation |
|---|---|---|
| Evaluation Object | Key Technology Elements (CTE) | Overall Economic Benefit of the Project |
| Core Indicators | TRL1-9 Level | EIRR/ENPV/FIRR |
| Method System | Checklist Method + Expert Review | Cash Flow Analysis |
Technology Maturity Level 9 Evaluation System
The standard divides technology maturity into three major development stages:
- R&D stage (TRL1-5): from basic principle discovery to simulated environment verification
- Engineering demonstration (TRL6-7): from prototype to engineering prototype verification
- Commercial application (TRL8-9): from offshore testing to commercial operation
Wave energy power generation deviceTypical verification path:
- TRL4: laboratory water tank test
- TRL6: offshore simulated environment test
- TRL8: continuous operation assessment in real sea conditions
Key technology identification method
| Criticality classification | Technical importance | Technical difficulty |
|---|---|---|
| Class A (major) | Class I (very important) | Class I (very difficult) |
| Class B (key) | Class II (important) | Class II (difficult) |
Systematically identify CTE through the Work Breakdown Structure (WBS) and Technical Breakdown Structure (TBS)
Key points for implementing economic evaluation
Core formula for national economic evaluation
Calculation of electricity sales revenue: $$B_s = E_e(1-\eta_{ap})(1-\eta_{tl})P$$
Economic internal rate of return determination: $$EIRR \geq i_s$$
Key indicators of financial evaluation
- Financial net present value (FNPV) ≥ 0
- Payback period ≤ industry benchmark
- Appropriate debt-to-asset ratio
Recommendations for standard implementation
- Technical evaluation priority: TRL assessment should be completed before economic analysis
- Dynamic adjustment mechanism: It is recommended to update the evaluation parameters every two years
- Risk prevention and control: Focus on the risk of technological leap from TRL5 to 6

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 36999-2018 in English
Requirements on environmental conditions of wave energy power station
2018-12-28 -

GB/T 42331-2023 in English
Directives for technology readiness assessment of tidal current energy generators
2023-03-17 -

GB/T 34910.2-2017 in English
Guidelines for marine renewable energy resources survey and assessment - Part 2: Tidal energy
2017-11-01 -

GB/T 35050-2018 in English
Code of practice of assessment for development and utilization of ocean energy
2018-05-14