Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
power grid power conversion system electrochemical energy storage system power grid dl/t energy storage system thematic maps coil spring oil ring corporate social responsibility management system ― zmplementation guidance scopethis document
GB/T 36547-2018 in English

GB/T 36547-2018 in English

SUPERSEDED

Technical rule for electrochemical energy storage system connected to power grid

  • Issued on:2018-07-13
  • Implemented on:2019-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $220.00
$214.00
Standard No: GB/T 36547-2018
Document status: SUPERSEDED
Superseded by: GB/T 36547-2024 Technical requirements for connecting electrochemical energy storage station to power grid
Superseded on: 2024-12-01
Title in English: Technical rule for electrochemical energy storage system connected to power grid
Title in Chinese: 电化学储能系统接入电网技术规定
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-07-13
Implemented on: 2019-02-01
ICS Classification: 27.180-Wind turbine systems and other alternative sources of energy
Chinese Classification: F19-New energy and others
Professional Classification: GB-National Standard
Related Keywords: power grid
power conversion system
electrochemical energy storage system
power grid dl/t
energy storage system
Related Topics: power grid
electrochemical
energy storage
Grid technology
Electrochemical standard
electrochemical system
electrochemical and
electrochemical capacity
Electrochemical test system
Electrochemical measurement system
electrochemical
electrochemical peak
Electrochemical Measurement Technology
reserve
Electrochemical measurement system
Modern Energy Storage Network
Electrochemical standard
Connect to the grid
Grid technology
Energy storage system
electrochemical energy storage
Electrochemical p
electrochemical peak
"Electrochemistry
GB T36547
GB/T36547
GB T36547-2018
GBT36547
GB/T 36547-2018
electrochemical energy storage
Test specifications for electrochemical energy storage systems connected to the power grid Zhengzhou foreign-funded enterprises
Compressed air energy storage power station access to power grid technology
The energy storage system is connected to the distribution network monitoring system function
Energy storage technology methods
Electrochemical energy storage power station access system design
Technical specification requirements for electronic letter of guarantee system access
Energy storage related technologies
Flywheel energy storage system grid access test
gbt36547
Flywheel grid access
gb/t 36547-2018
gb/t36547-2018
gbt36547-2018
gb/t 36547
Electrochemical energy storage noise standard table
gb36547
gb/t 36547-2024
gb/t 36547 pdf

《GB/T 36547-2018电化学储能系统接入电网技术规定》由TC550(全国电力储能标准化技术委员会)归口,主管部门为中国电力企业联合会。


ChinaStandards.net is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative.

This standard is developed in accordance with the rules given in GB/T 1.1-2009.

Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. The issuing body of this document shall not be held responsible for identifying any or all such patent rights.

This standard was proposed by the China Electricity Council (CEC).

This standard is under the jurisdiction of National Technical Committee 550 on Electric Energy Storage of Standardization Administration of China (SAC/TC 550).

Technical rule for electrochemical energy storage system connected to power grid


Technical rule for electrochemical energy storage system connected to power grid

1 Scope

This standard specifies the technical requirements of the electrochemical energy storage system for connecting to the power grid, such as power quality, power control, power grid adaptability, protection and automatic safety devices, communication and automation, power metering, grounding and safety signs, and connecting test to power grid.

This standard is applicable to electrochemical energy storage systems with rated power of 100 kW and above and energy storage time of not less than 15 min, and it may also apply to electrochemical energy storage systems with other power levels and energy storage time.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.
GB 2894 Safety signs and guideline for the use
GB/T 12325 Power quality - Deviation of supply voltage
GB/T 12326 Power quality - Voltage fluctuation and flicker
GB 14050 Types and safety technical requirements of system earthing
GB/T 14285 Technical code for relaying protection and security automatic equipment
GB/ T 14549 Quality of electric energy supply - Harmonics in public supply network
GB/T 15543 Power quality - Three-phase voltage unbalance
GB/T 19862 Power quality - General requirements for monitoring equipment of power quality
GB/T 24337 Power quality - Interharmonics in public supply network
GB/T 31464 The grid operation code
GB 50057 Design code for protection of structures against lightning
GB/T 50065 Code for design of AC electrical installations earthing
GB/T 36548 Test specification for electrochemical energy storage system connected to power grid
DL/T 448 Technical administrative code of electric energy metering
DL/T 584 Setting guide for 3 kV ~ 110 kV power system protection equipment
DL/T 645 Multi-function watt-hour meter communication protocol

3 Terms and definitions

For the purposes of this document, the following terms and definitions apply.

3.1

electrochemical energy storage system
a system in which electrochemical cells are used as energy storage carriers and recyclable electric energy is stored and released through a power conversion system

Note: It generally includes battery system, power conversion system and related auxiliary facilities. For electrochemical energy storage systems connected to a voltage class of 10(6) kV and above, they usually include collecting lines, step-up transformers, etc.

3.2

power conversion system
a device that connects the battery system with the power grid (and/or load) to realize bidirectional conversion of power

3.3

point of interconnection
for an energy storage system with a step-up transformer, point of interconnection refers to the bus or node on the high voltage side of the step-up transformer. For an energy storage system without step-up transformer, point of interconnection refers to the output summary point of the energy storage system

Note: See Annex A for the illustration of point of common coupling.

3.4

point of common coupling
A point where energy storage system connects to the public power grid

Note: See Annex A for the illustration of point of common coupling.

3.5

hot standby state
a state when energy storage system is in condition to run, the equipment protection and automatic devices are in normal running state, and the energy exchange with the power grid can be realized by issuing control instructions to the energy storage system

3.6

response time for charging
the time for the energy storage system to change from the hot standby state to charging after it receives the control signal until the charging power reaches 90% of the rated power PN for the first time

See Figure 1.


Figure 1 Response time for charging

3.7

regulation time for charging
the time for the energy storage system to change from the hot standby state to charging after it receives the control signal until the charging power reaches the rated power PN and the power deviation starts to be controlled within ±2% of the rated power PN

See Figure 2.


Figure 2 Regulation time for charging

3.8

response time for discharging
the time for the energy storage system to change from the hot standby state to discharging after it receives the control signal until the discharging power reaches 90% of the rated power PN for the first time

See Figure 3.


Figure 3 Response time for discharging

3.9

regulation time for discharging
the time for the energy storage system to change from the hot standby state to discharging after it receives the control signal until the discharging power reaches the rated power PN and the power deviation starts to be controlled within ±2% of the rated power PN

Foreword i
1 Scope
2 Normative references
3 Terms and definitions
4 Basic requirements
5 Power quality
6 Power control
7 Power grid adaptability
8 Protection and automatic safety device
9 Communication and automation
10 Electric energy metering
11 Grounding and safety signs
12 The power grid connecting test
Annex A (Informative) Illustration of point of interconnection and point of common coupling
Annex B (Informative) Recommended class of voltage for electrochemical energy storage system connected to power grid

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend