GB/T 36711-2018 in English
VALIDGeneral principles for energy conservation assessment—Pure terephthalic acid project
- Issued on:2018-09-17
- Implemented on:2019-04-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$156.00
《GB/T 36711-2018节能评估技术导则 精对苯二甲酸项目》由TC20(全国能源基础与管理标准化技术委员会)归口,TC20SC3(全国能源基础与管理标准化技术委员会能源管理与节能评估分会)执行,主管部门为国家标准化管理委员会。
Introduction
Interpretation of GB/T 36711—2018 National Standard of the People's Republic of China
| Standard Clauses | Main Contents | Scope of Application | Comparative Analysis |
|---|---|---|---|
| 1 Scope | Specifies the energy conservation assessment content and requirements for PTA fixed asset investment projects. | Applicable to newly built, modified and expanded PTA fixed asset investment projects. | Compared with GB/T 31341, it adds specific requirements for modified and expanded projects. |
| 4.2 Analysis and Evaluation | Detailed provisions for energy-saving evaluation of process solutions, energy-saving evaluation of general layout, energy-saving evaluation of major energy-consuming processes and equipment, etc. | Applicable to the preliminary preparation and implementation stages of the project. | Added evaluation requirements for energy metering equipment configuration plans. |
Explanation of professional terms and practical application cases
Purified terephthalic acid (PTA): It is an important chemical fiber raw material and is widely used in polyester fiber production.
Take a new PTA project as an example. Its process flow includes key steps such as oxidation of paraxylene and separation of crude terephthalic acid. Energy consumption can be significantly reduced by optimizing the energy efficiency of process air compressors and dehydration tower reboilers.
Background of Standard Formulation and Analysis of Technological Evolution
With the rapid development of my country's chemical fiber industry, the energy-saving demand of purified terephthalic acid projects has become increasingly prominent. This standard is based on basic standards such as GB/T 31341 and GB 31533, and combines advanced processes and technologies at home and abroad to further refine the specific requirements for energy-saving assessment.
Implementation Suggestions
- Preliminary preparation stage: Ensure full communication with the construction unit and clarify the boundaries and scope of project energy use.
- On-site investigation stage: Pay attention to the utilization conditions of surrounding surplus energy and optimize energy allocation plans.
- Energy-saving measures evaluation stage: Compare advanced processes and equipment at home and abroad, and put forward operational improvement suggestions.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 33757.2-2024 in English
Energy saving ratio for distributed energy system of combined cooling, heating and power—Part 2: Multi-energies hybrid driven systems
2024-09-29 -

GB/T 10201-2008 in English
Regulations of proper usage of electricity in heat treatment industry
2008-06-19 -

GB 19044-2022 in English
Minimum allowable values of energy efficiency and energy efficiency grades of fluorescent lamps for general lighting
2022-12-29 -

GB/T 15317-2009 in English
Monitoring and testing for energy saving of coal fired industrial boilers
2009-10-30 -

GB/T 43866-2024 in English
Inspection method for equipping rate of energy measuring instrument for enterprises
2024-04-25 -

GB/Z 18718-2002 in English
Energy saving directives for heat treatment
2002-05-17 -

GB/T 38067-2019 in English
Specification for equipping and managing of measuring instruments of energy in shipbuilding enterprises
2019-10-18 -

GB/T 16666-2012 in English
Monitoring and testing for energy saving of motor-pump liquid transport system
2012-12-31 -

GB 45549-2025 in English
Norm of energy consumption per unit production of graphite and fluorite
2025-03-28 -

GB/T 6422-2009 in English
Testing guide for energy consumption of equipment
2009-03-11