Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
energy efficiency assessment energy efficiency energy consumption impact assessment calculate advanced energy efficiency energy efficiency optimization static cracking police uniform.coagulation fabric — chemical protective clothing
GB/T 36716-2018 in English

GB/T 36716-2018 in English

VALID

General principles for energy conservation assessment—Coal-fired power generation project

  • Issued on:2018-09-17
  • Implemented on:2019-04-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: GB/T 36716-2018
Document status: VALID
Title in English: General principles for energy conservation assessment—Coal-fired power generation project
Title in Chinese: 节能评估技术导则 燃煤发电项目
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-09-17
Implemented on: 2019-04-01
ICS Classification: 27.010-Energy and heat transfer engineering in general
Chinese Classification: F01-Technical management
Professional Classification: GB-National Standard
Related Keywords: energy efficiency assessment
energy efficiency
energy consumption impact assessment calculate
advanced energy efficiency
energy efficiency optimization
Related Topics: Coal-fired power generation
power generation project
non-volatile items
power generation project
Development of energy saving
Technical Guidelines for Project Water Conservation Assessment
Technical Guidelines for Project Water Conservation Assessment
Project testing technology frontier
Conductometric Evaluation
performance test project
Technical Guidelines for Project Water Conservation Assessment
"Technical Guidelines for Energy Conservation Assessment for Combined Heat and Power Projects"
Purpose of the guideline
Mid-Year Evaluation Purpose
"Technical Guidelines for Project Water Conservation Assessment"
Project Risk Assessment Techniques
Energy Conservation Assessment Technical Guidelines for Wind Power Projects
GBT36716
GB/T 36716-2018
Coal-fired power generation equipment
Project technical performance
Project technology and

《GB/T 36716-2018节能评估技术导则 燃煤发电项目》由TC20(全国能源基础与管理标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

Introduction

GB/T 36716—2018 "Technical Guidelines for Energy Efficiency Assessment for Coal-fired Power Generation Projects" provides standardized guidance for energy efficiency assessment of coal-fired power generation projects in my country, aiming to improve energy efficiency and promote sustainable development. This article will explain the core content of the standard in detail and analyze it in combination with actual cases.

The Importance of Energy Efficiency Assessment

With the growth of global energy demand and the intensification of environmental problems, energy efficiency optimization of coal-fired power generation projects has become crucial. Energy efficiency assessment is not only a compliance requirement, but also a key strategy for enterprises to enhance their competitiveness.

Comparative Analysis of Standard Frameworks

Standard Dimensions GB/T 36716—2018 International Comparison Other Domestic Standards
Scope and Applicability New or Renovated Coal-fired Power Generation Projects Covering a wider range of energy types Focusing on single energy type assessment
Technical Requirements Detailed Technical Parameters and System Analysis Focusing on Overall Energy Efficiency Improvement Emphasis on Specific Equipment Energy Efficiency
Evaluation Methods Based on GB/T 3484 Energy Balance Analysis Use Life Cycle Assessment Use Simple Energy Consumption Calculation

Specific Implementation Steps of Energy Saving Assessment

Preliminary Preparation

Clearly define the scope of energy saving assessment and collect basic materials for the project, including technical parameters and energy efficiency data of energy-consuming equipment.

Analysis and Evaluation

Evaluate the main engine selection, general layout and main energy-consuming systems in detail. For example, the main engine will affect the overall energy efficiency, and it is necessary to select a model that meets the advanced level. Boiler efficiency and turbine heat rate in coal-fired power generation projects are key indicators.

Energy Consumption Impact Assessment

Calculate the annual comprehensive energy consumption of the project and analyze the impact on the energy structure of the location. Coal reduction and substitution solutions need to be considered in key areas.


Implementation Recommendations

Case Study: Energy Saving Optimization of a Coal-fired Power Plant

By optimizing the heat consumption rate of steam turbines and boiler efficiency, the plant saves 15,000 tons of standard coal per year and significantly reduces operating costs.

It is recommended that enterprises adopt advanced energy efficiency monitoring systems and conduct energy efficiency audits regularly to ensure continuous improvement.

Sample only — not a preview of GB/T 36716-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend