Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
power-off phase separation system railway applications technical criteria train control mode neutral-section passing system train length matches exhibition logistics forest ecosystem effects in-plant radiation protection design
GB/T 36981-2018 in English

GB/T 36981-2018 in English

VALID

Railway applications—Technical criteria for the co-ordinations in the passenger train neutral-section passing system with no power consumption

  • Issued on:2018-12-28
  • Implemented on:2019-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: GB/T 36981-2018
Document status: VALID
Title in English: Railway applications—Technical criteria for the co-ordinations in the passenger train neutral-section passing system with no power consumption
Title in Chinese: 轨道交通 客运列车断电过分相系统相互匹配准则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-12-28
Implemented on: 2019-07-01
ICS Classification: 29.280-Electric traction equipment
Chinese Classification: S04-Basic standards and general methods
Professional Classification: GB-National Standard
Related Keywords: power-off phase separation system
railway applications technical criteria
train control mode
neutral-section passing system
train length matches
Related Topics: mutual balance mutual mechanism
Positive and negative phase system over
GBT36981
GB/T 36981-2018
DIN6799 Daoke
gjb6387 Daoke
jgj52 Daoke
GB18884.4 Daoke
YYT1829 Daoke
gjb8875 Daoke

《GB/T 36981-2018轨道交通 客运列车断电过分相系统相互匹配准则》由TC278(全国轨道交通电气设备与系统标准化技术委员会)归口,主管部门为国家铁路局。


Introduction

Overview of the mutual matching criteria for the power-off and phase-splitting systems of rail transit trains

GB/T 36981—2018 standard mainly stipulates the technical requirements for the power-off and phase-splitting systems of passenger trains in $25~\mathrm{kV}, 50~\mathrm{Hz}$ AC electrified railways, and is applicable to lines with a maximum operating speed of no more than $350~\mathrm{km/h}$.

Comparison of Standard Frameworks

Chapter Number Content Overview Keywords
1 Scope and Applicability $25~\mathrm{kV},50~\mathrm{Hz}$AC Electrified Railway
4 General Principles and System Relevance Traction Power Supply, Signaling System, Train Control Mode
5 Technical Requirements (Compatibility, Reliability, Operation) Electric phase separation neutral section length, no-power section length
6 Control mode (automatic and manual) Train control automatic, vehicle-mounted automatic, manual control

Technical background and development

The core goal of the train power-off phase separation system is to ensure the safe operation of the train when passing through the no-power section. With the increase in the speed of high-speed rail, the traditional phase separation method can no longer meet the needs of high-speed operation, and articular electric phase separation and device electric phase separation have become the mainstream solutions.

Implementation suggestions and precautions

Case analysis: When designing a high-speed railway power-off over-phase system, the following factors need to be considered comprehensively:

  • Train length matches pantograph spacing ($200~\mathrm{m}{\sim}215~\mathrm{m}$)
  • Neutral section length setting ($380~450~\mathrm{m}$)
  • De-energized section length (not less than double pantograph spacing, $L_{nz}{\sim}220~\mathrm{m}$)

Sample only — not a preview of GB/T 36981-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 32588.2-2025 in English

    GB/T 32588.2-2025 in English

    Railway applications—Automated urban guided transport (AUGT)—Safety requirements—Part 2: Hazard analysis at top system level

    2025-01-24
  • GB/T 32358-2025 in English

    GB/T 32358-2025 in English

    Railway applications—Test methods of rolling stock on test rigs

    2025-12-31