Introduction
Standard framework and technological evolution
As a supporting standard for GB/T 26557-2011 "Construction elevators for both passengers and cargo with vertically guided cages", this standard has established for the first time a safety monitoring technology system covering the entire life cycle of construction elevators. Compared with GB/T 28264-2017 "Safety Monitoring and Management System for Lifting Machinery", technological breakthroughs are achieved in the following aspects:
| Comparison dimensions | GB/T 28264-2017 | GB/T 37537-2019 |
|---|---|---|
| Monitoring parameters | 12 basic parameters | 16 enhanced parameters (newly added speed, oil temperature, etc.) |
| Sampling period | ≤500ms | ≤100ms |
| Warning mechanism | Single-level alarm | Second-level warning (yellow/red double threshold) |
| Data storage | 15 working days | 30 consecutive working days |
Analysis of core technical requirements
4.1 System architecture requirements
The system should adopt a modular design, including 9 major functional units:
- Information acquisition unit: It needs to be configured with height/speed/weight sensors, with a comprehensive error of ≤2%
- Alarm unit: Secondary early warning mechanism (load 0.95G triggers yellow light, 1.1G triggers red light shutdown)
- Remote transmission unit: Supports TCP/IP protocol, with a transmission interval of ≤15s
4.13 Key performance indicators
| Monitoring items | Allowable error | Test method |
|---|---|---|
| Load | ≤5% | GB/T 28264-2017 7.3.1 |
| Operating speed | ≤2% | Formula calculation (Formula 3) |
| Operating height | ≤2% | Three-point measurement method (Formula 1) |
Implementation points and case analysis
Typical application scenarios
Case: Renovation of the monitoring system of SC200/200 construction elevator at a construction site:
- Configure WSN-300 weight sensor (accuracy 0.5%)
- Use LoRa wireless transmission module (transmission distance 150m)
- Connect to provincial supervision platform through Appendix A protocol
Frequently Asked Questions
According to clause 7.4.4, the following situations require re-debugging:
- Error exceeds standard after system component replacement
- Elevator installation height changes by more than 10%
- Data deviation is found during quarterly inspection
Communication protocol technical specifications
Appendix A specifies a strict communication frame structure:
Frame structure: [0xA55A][Length][Version][Time][Type][Device ID][Information segment][Checksum][0xC33C] Key frame type: 0x10 - Real-time data (including 33 bytes of data such as load/height/speed) 0x12 - Working cycle record (34 bytes including start and end time, maximum load)
Data security requirements
- Use a 6-digit password to protect parameter modification permissions (Clause 4.11)
- Startup is prohibited if operator identification fails (Clause 4.12)
- Insulation resistance ≥ 5MΩ (Clause 4.15.2)

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 9465-2018 in English
Vehicle-mounted mobile elevating work platform
2018-05-14 -

GB/T 3811-2008 in English
Design rules for cranes
2008-04-30