GB/T 37546-2019 in English
VALIDTechnical specification for unattended substation monitoring and control system
- Issued on:2019-06-04
- Implemented on:2020-01-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$214.00
《GB/T 37546-2019无人值守变电站监控系统技术规范》由TC82(全国电力系统管理及其信息交换标准化技术委员会)归口,主管部门为中国电力企业联合会。
Introduction
Overview of unattended substation monitoring system
Unattended substation monitoring system is an important component for realizing remote monitoring and management in power system. This standard specifies the overall requirements, structural configuration, functional requirements and performance indicators of the system, aiming to ensure the efficient operation and safety of the system in unattended mode.
System structure and configuration
| System level | Equipment configuration | Function description |
|---|---|---|
| Station control layer | Monitoring host, data communication gateway, integrated application server, etc. | Responsible for data processing, operation monitoring and remote control of the whole station. |
| Interval layer | Measurement and control device | Collect information of primary and secondary equipment to realize real-time control function. |
| Process layer | Merge unit, intelligent terminal | Digital sampling and network tripping, support protection and measurement and control. |
Functional requirements analysis
Data collection and processing
The system needs to realize real-time collection of power grid operation information, including current, voltage, active power and other parameters. Data processing should support logical operations and arithmetic operations, and have bad data detection function.
Safety protection and performance indicators
The monitoring system must comply with the "Electric Power Monitoring System Safety Protection Regulations" to achieve network partitioning, horizontal isolation and vertical authentication. System performance requirements include high-precision measurement (such as current and voltage measurement accuracy ≤0.2%) and fast response time (such as remote control execution response time ≤1s).
Implementation suggestions
- Hardware selection: Give priority to equipment that meets the DL/T series standards to ensure compatibility and reliability.
- Network security: Deploy hardware firewalls and forward and reverse safety isolation devices to ensure system information security.
- Function verification: Verify whether functions such as direct alarm transmission and remote browsing meet the standards through actual application cases.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 25320.11-2023 in English
Power systems management and associated information exchange—Data and communications security—Part 11:Security for XML documents
2023-12-28 -

GB/T 44773-2024 in English
Technical specifications for remote automatic power control (ADC) of high voltage direct current converter station
2024-10-26 -

GB/T 39674-2020 in English
Test specification on softswitch system of power industry
2020-12-14 -

GB/T 28815-2025 in English
Technical requirements for master station of real-time dynamic monitoring system of power system
2025-12-02 -

GB/Z 25320.1001-2023 in English
Power systems management and associated information exchange— Data and communication security—Part 100-1 : Conformance test cases for IEC 62351-5 and IEC TS 60870-5-7
2023-12-28 -

GB/Z 43728.1-2024 in English
Power systems management and associated information exchange—Part 1:Reference architecture
2024-03-15