GB/T 38332-2019 in English
VALIDSmart grid consumer automatic demand response—Technical condition of central air conditioning system terminal
- Issued on:2019-12-10
- Implemented on:2020-07-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$243.00
| Standard No: | GB/T 38332-2019 |
| Document status: | VALID |
| Title in English: | Smart grid consumer automatic demand response—Technical condition of central air conditioning system terminal |
| Title in Chinese: | 智能电网用户自动需求响应 集中式空调系统终端技术条件 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2019-12-10 |
| Implemented on: | 2020-07-01 |
| ICS Classification: | 35.200-Interface and interconnection equipment |
| Chinese Classification: | F20- |
| Professional Classification: | GB-National Standard |
| Related Keywords: | automatic demand response technical condition
centralized air conditioning system automatic demand response terminal centralized air conditioning system terminals automatic demand response |
| Related Topics: | Air Conditioning System
GBT38332 Intelligent microaerophilic culture system gb/t 38332 |
《GB/T 38332-2019智能电网用户自动需求响应 集中式空调系统终端技术条件》由TC549(全国智能电网用户接口标准化技术委员会)归口,主管部门为中国电力企业联合会。
Introduction
Interpretation of Technical Requirements for Centralized Air Conditioning System Terminals with Automatic Demand Response for Smart Grid Users
1. Background and Significance of Standard Formulation
With the rapid development of smart grids, power demand response technology plays an important role in improving the efficiency and stability of power grid operations. As a large power consumer, the technical specifications of the automatic demand response terminal of the centralized air conditioning system are directly related to the reliability and response speed of the system. The formulation of this standard aims to unify technical requirements, standardize product design and testing, and provide solid support for the construction of smart grids.
2. Comparison of standard frameworks
| Standard dimensions | GB/T 38332—2019 | Reference standards | Comparative analysis |
|---|---|---|---|
| Environmental conditions | -5~+45℃(Shielded C1) -25~+55℃(Shielded C2) | GB/T 9254-2008 | Wider adaptability, new outdoor C3 standard |
| Functional configuration | Full-link functions such as data collection, storage, query, and control | - | New demand response strategy update and local display function |
| Performance requirements | MTBF ≥8000 hours | - | Improve reliability and adapt to complex power grid environment |
3. Interpretation of the core content of the standard
3.1 Environmental condition requirements
The automatic demand response terminal of the centralized air-conditioning system needs to adapt to a variety of environmental conditions, which are specifically classified as follows:
| Place type | Level | Air temperature (℃) | Maximum change rate (℃/min) | Relative humidity (%) | Maximum absolute humidity (g/m³) |
|---|---|---|---|---|---|
| Shielding | C1 | -5~+45 | \n0.5 | 5~95 | 29 |
| C2 | -25~+55 | 0.5 | 10~100 |
4. Implementation Suggestions and Precautions
4.1 Equipment Selection Suggestions
When selecting a demand response terminal, focus on the following aspects:
- Communication interface compatibility: Ensure support for mainstream protocols such as Ethernet and LonWorks.
- Collection accuracy and frequency: It is recommended to use high-precision sensors with a minimum interval of 10 seconds.
- Security: Select a hardware security module certified by the State Cryptography Administration.
4.2 System Integration Precautions
During the system integration process, it is recommended to take the following measures:
- Data consistency management: Ensure data synchronization between devices.
- Emergency plan formulation: Plan response strategies in advance for extreme weather or equipment failures.
- Regular maintenance and updates: It is recommended to perform system inspections and firmware upgrades every quarter.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.