GB/T 38604.2-2020 in English
VALIDPublic information guidance systems- Assessment requirement-Part 2: Railway passenger station
- Issued on:2020-03-31
- Implemented on:2020-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$214.00
| Standard No: | GB/T 38604.2-2020 |
| Document status: | VALID |
| Title in English: | Public information guidance systems- Assessment requirement-Part 2: Railway passenger station |
| Title in Chinese: | 公共信息导向系统 评价要求 第2部分:铁路旅客车站 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2020-03-31 |
| Implemented on: | 2020-10-01 |
| ICS Classification: | 01.080.10-Public information symbols |
| Chinese Classification: | A22-Terms and Symbols |
| Professional Classification: | GB-National Standard |
| Related Keywords: | railway passenger station introduction analysis
public information guidance standard evaluation dimensions key indicators test methods functionality information accuracy passenger error rate dynamic information |
| Related Topics: | Systematic Evaluation Criteria
traveler system assesment railway passenger station GB/T 38604.2 GB/T 38604.2-2020 public oriented national standard |
《GB/T 38604.2-2020公共信息导向系统 评价要求 第2部分:铁路旅客车站》由TC59(全国图形符号标准化技术委员会)归口,TC59SC1(全国图形符号标准化技术委员会城市导向分会)执行,主管部门为国家标准化管理委员会。
Introduction
Analysis of the core content of the standard
| Evaluation dimensions | Key indicators | Test methods |
|---|---|---|
| Functionality | Information accuracy ≥ 95% | On-site sampling verification |
| Normativity | Sign compliance rate ≥ 90% | Expert review + instrument testing |
| Continuity | Streamline completeness 100% | Simulated passenger flow test |
Technological Evolution Analysis
Compared with the 2008 version of the standard, the 2020 version added special evaluation requirements for accessible signs, and strengthened:
- Evaluation weight of dynamic information (such as electronic screens)
- Normative testing of multilingual signs
- Requirements for connection with urban transportation
Implementation Recommendations
Case: In the Beijing South Railway Station renovation project, by increasing the night reflectivity of the platform and carriage location signs (from 50cd/lx to 80cd/lx), the passenger error rate dropped by 42%.
Recommendations for priority optimization:
- Continuity verification of transfer and connection signs
- Stress testing of the guidance system during peak hours
- Integration of multimodal information (graphics + voice + AR)

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 45419-2025 in English
Emblem of the Young Pioneers of China
2025-02-28 -

GB/T 31523.2-2015 in English
Safety information identification systems―Part 2:Setting principles and requirements
2015-05-15 -

GB/T 18302-2026 in English
Basic requirements for instruments to fly the national flag
2026-01-28 -

GB 16689-2004 in English
Regional flag of Hong Kong special administrative region
2004-07-01 -

GB/T 2893.1-2013 in English
Graphical symbols—Safety colours and safety signs—Part 1:Design principles for safetry signs and safety markings
2013-07-19