Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
system management module configuration management chapter configuration management information technology big data functional requirements maintenance management classification objects engine groups composite insulation panels
GB/T 38633-2020 in English

GB/T 38633-2020 in English

VALID

Information technology—Big data—Functional requirements for system operation and management

  • Issued on:2020-04-28
  • Implemented on:2020-11-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $100.00
$97.00
Standard No: GB/T 38633-2020
Document status: VALID
Title in English: Information technology—Big data—Functional requirements for system operation and management
Title in Chinese: 信息技术 大数据 系统运维和管理功能要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2020-04-28
Implemented on: 2020-11-01
ICS Classification: 35.240-Applications of information technology
Chinese Classification: L67-Computer application
Professional Classification: GB-National Standard
Related Keywords: system management module
configuration management chapter
configuration management
information technology big data functional requirements
maintenance management
Related Topics: Big Data
According to system function
big data system
System Functional Requirements
GBT38633
GB/T 38633-2020
Functional requirements for operation, maintenance and management of big data systems
information technology big data
General information technology big data system
Information Technology Big Data Big Data System Basic Requirements
Data logger operation and maintenance requirements
Equipment remote operation and maintenance system data fusion technology
Energy storage system operation and maintenance technology

《GB/T 38633-2020信息技术 大数据 系统运维和管理功能要求》由TC28(全国信息技术标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

Analysis of the core framework of the standard

As a supporting standard for GB/T38673-2020, GB/T38633-2020 puts forward detailed functional requirements for the system management module for the operation and maintenance management of big data systems. The standard adopts modular design, including:

Functional modulesCore requirementsTechnical innovations
Installation and deployment20 mandatory requirementsSupport automatic connection of non-password SSH, intelligent disk identification
Configuration management15 mandatory requirementsProvide parameter impact identification mechanism
Monitoring and alarm16 mandatory requirementsSupport multi-dimensional data aggregation and analysis

Details of key technical requirements

1.

Chapter 6 of the standard stipulates that installation and deployment must achieve full life cycle automation:

  • Pre-check mechanism: Requires pre-installation detection of server hardware, operating system and other environments
  • Fault-tolerant design: Single node failure does not affect the overall deployment process (Clause 6.g)
  • Elastic expansion: Support cluster online addition and deletion of nodes (Clause 6.q)

2. Refined configuration management

Chapter 7 proposes that configuration management must achieve:

Case: A financial enterprise uses configuration templates to implement batch updates of 200+ node parameters, reducing the time taken from 8 hours to 15 minutes


Standard implementation suggestions

  1. Phase-based implementation: prioritize mandatory clauses (should clauses) and gradually implement recommended clauses (should clauses)
  2. Toolchain adaptation: select an operation and maintenance platform that supports standard APIs (clause 6.m)
  3. Staff training: focus on developing specialized capabilities in configuration management (Chapter 7) and health checks (Chapter 11)

Sample only — not a preview of GB/T 38633-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend