Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
radiation shielding cyclotron proton accelerator proton cyclotron introduction analysis proton beam proton tvl iron ores-determination transportation activities other mechanical spline shafts
GB/T 39325-2020 in English

GB/T 39325-2020 in English

VALID

Specification for radiation shielding of superconducting proton cyclotron

  • Issued on:2020-11-19
  • Implemented on:2021-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: GB/T 39325-2020
Document status: VALID
Title in English: Specification for radiation shielding of superconducting proton cyclotron
Title in Chinese: 超导回旋质子加速器辐射屏蔽规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2020-11-19
Implemented on: 2021-06-01
ICS Classification: 27.120.99-Other standards related to nuclear energy
Chinese Classification: F91-Medical accelerator
Professional Classification: GB-National Standard
Related Keywords: radiation shielding
cyclotron proton accelerator
proton cyclotron introduction analysis
proton beam
proton tvl
Related Topics: superconducting
superconducting standard
accelerator
superconducting+
Recovery shielding box
proton
Shielding box recycling
Screen
Ultra-fast transmission of light
first-class accelerator
radiation shielding
Acceleration of related substances
entropic superconductivity
Instrument shielding box
superradiant phase
proton accelerator
screen shot
cyclotron accelerator
ion beam accelerator
proton flow
new cyclotron
cyclotron accelerator
Cyclotron
some kind of ion accelerator
cyclotron
Cyclotron
accelerator radiation shielding
accelerator radiation shielding
accelerator molybdenum
superconducting instrument
superconducting instrument
ion trap accelerator
Accelerated version
electron radiation accelerator
electron cyclotron
roundabout
Electron accelerator titanium window
proton energy
micro ion accelerator
radiation shielding
superconducting technology
Proton application
GBT39325
GB/T 39325-2020
shield
accelerator33222
Characteristics of cyclotron
Cyclotron environmental testing method
Electron accelerator radiation shielding
Specifications related to proton cyclotron
spacecraft radiation shielding
National Standards for Shield Grounding

《GB/T 39325-2020超导回旋质子加速器辐射屏蔽规范》由TC58(全国核能标准化技术委员会)归口,TC58SC2(全国核能标准化技术委员会辐射防护分会)执行,主管部门为国家标准化管理委员会。


Introduction

Analysis of the core content of the standard

This standard establishes a complete shielding design technology system for the special radiation protection needs of superconducting cyclotron proton accelerator, mainly covering:

  • Shielding applicability of proton energy range 70-1000MeV
  • Secondary neutron yield calculation model (Formula 1-3)
  • One-tenth value layer data of materials such as concrete/baryte concrete/iron
  • Special considerations for sky scatter and side scatter radiation

Comparison of key technical parameters

Parameters Ordinary concrete Baryte concrete Iron
Density (g/cm³) 2.35 3.2 7.4
TVL₀(cm) 162 139 82
220MeV proton TVL 108 93 55

Key points of secondary neutron protection

Take 220MeV proton beam as an example:

  1. Secondary neutron yield 0.63 neutrons/proton (Formula 1)
  2. Forward radiation dose rate 0.27Sv/h@1m (1.6nA beam current)
  3. Concrete shielding requires 381cm to achieve a control level of 2.5μSv/h

Note: The calculation adopts the 1.5th power inverse law to conservatively consider the wall reflection effect


Implementation suggestions

Design phase

  • Integrally cast concrete structure is preferred
  • The width of the maze must be ≥1.5 times the equipment transportation size
  • The through-hole adopts a Z-shaped bend design

Operation phase

  • Periodically conduct shielding integrity testing
  • It is recommended to add a boron-containing polyethylene layer on the inner surface of the maze
  • Establish a Monte Carlo model to verify the hot spot area

Sample only — not a preview of GB/T 39325-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.