Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
ig541 mixed-gas extinguishing systems hydraulic fluid power code communication load
GB/T 39336-2020 in English

GB/T 39336-2020 in English

VALID

Technical requirement of roadside bag filling for gob-side entry retaining with high-water material

  • Issued on:2020-11-19
  • Implemented on:2021-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $190.00
$185.00
Standard No: GB/T 39336-2020
Document status: VALID
Title in English: Technical requirement of roadside bag filling for gob-side entry retaining with high-water material
Title in Chinese: 沿空留巷巷旁袋式充填技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2020-11-19
Implemented on: 2021-06-01
ICS Classification: 73.020-Mining and quarrying
Chinese Classification: D15-Mining
Professional Classification: GB-National Standard
Related Topics: Frontier Material Testing
Frontier Coil Requirements
water material
Material cutting-edge technology
Frontiers of Polymer Materials
Alley
Frontier New Materials
Frontiers of Polymer Materials
Frontier Material Layout
Frontiers of Optoelectronic Materials
Frontier Waterproof Material Thickness
filling
Frontier New Materials
State-of-the-art technologies in materials chemistry
Cutting edge technology of material testing
GBT39336
GB/T 39336-2020
High water material

《GB/T 39336-2020沿空留巷高水材料巷旁袋式充填技术要求》由603(中国煤炭工业协会)归口,主管部门为中国煤炭工业协会。


Introduction

Technical background and evolution of the standard

With the increase in the depth of coal mining in my country, traditional tunneling technology faces problems such as severe mine pressure and high support costs. This standard systematically regulates the application of high-water materials (water volume ratio ≤90%) in tunneling projects along the goaf for the first time. Compared with traditional gangue filling, it has the characteristics of fast setting speed (4h strength reaches 1.2-4MPa) and good roof connection performance.


Core Technology Innovation

Technical DimensionTraditional TechnologyThis Standard SolutionImproved Benefits
Material SystemSingle-Component Cement SlurryTwo-Component (Material A/Material B)Controllable Setting Time (10-30s)
Transportation MethodSingle-Line PumpingDual-Line + Y-Type MixerMixing Uniformity Improved by 40%
Support structureRigid wallBag filling + tension anchorLateral bearing capacity increased by 2-3 times

Key process parameter control

Pulping system configuration requirements

The standard stipulates that the pulping system must include: automatic metering system, double mixing barrel group (1 each for prefabricated/finished product), and plunger grouting pump (JB/T 7043 compliant). The typical configuration is shown in Figure 1, where:

  • Water temperature control range: 18-30℃
  • Slurry flow rate lower limit: 2m/s
  • Mixed slurry pipe diameter ratio: 1.1-1.3 times single slurry pipe

Solutions to implementation difficulties

Anti-slip measures for large-angle tunnels

For coal seam inclination >15°, the standard innovatively proposes the anti-slip anchor bolt design (see Figure 5):

  1. The anchor end penetrates the bottom rock layer ≥1.2m
  2. The rod body and the filling body are bonded with epoxy resin
  3. The preload force is not less than 50kN

Quality control system

Establish a three-level detection mechanism:

Testing stageTesting itemsQualified standardsMethod basis
Material deliveryFineness≤45μm sieve residue<15%GB/T 39337
Construction processFilling densityVent hole overflow rate 100%Visual inspection
Finished product acceptance28d strength≥design value 120%Core sampling

Sample only — not a preview of GB/T 39336-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend