Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
natural gas(lng)fueling installations introduction analysis closing time ≤10 secondsstrengthen emergency response capabilities key low-temperature gas emergency shut-off high-pressure filling needs safety new regulationsupgrade points design pressure1.6mpa insulation coordination margin condenser scopethis part infusion patches
GB/T 41319-2022 in English

GB/T 41319-2022 in English

VALID

Liquefied natural gas(LNG)fueling installations

  • Issued on:2022-03-09
  • Implemented on:2022-10-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $600.00
$582.00
Standard No: GB/T 41319-2022
Document status: VALID
Title in English: Liquefied natural gas(LNG)fueling installations
Title in Chinese: 液化天然气(LNG)加液装置
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2022-03-09
Implemented on: 2022-10-01
ICS Classification: 91.140-Installations in buildings
Chinese Classification: P47-Gas supply engineering
Professional Classification: GB-National Standard
Related Keywords: natural gas(lng)fueling installations introduction analysis
closing time ≤10 secondsstrengthen emergency response capabilities key
low-temperature gas emergency shut-off
high-pressure filling needs safety
new regulationsupgrade points design pressure1.6mpa
Related Topics: liquified natural gas
gas explosion
liquid device
Liquid collection device
natural gas lng
natural gas lng
astronomical device
natural gas liquid nitrogen
pumping device
Although the liquid phase
LNG ignition
Sample solution
Add liquid
Liquefied Natural Gas Sulfur Content
liquid nitrogen tank natural gas
LNG quality for vehicles
natural gas installation
Liquid nitrogen natural gas
natural gas liquid pool
GBT41319
GB/T 41319-2022
LNG loading and unloading
natural gas
Advantages of installing gas purification device for chromatography
Liquefied natural gas pressure sealing technology
Liquefied natural gas pressure sealing technology
Liquefied natural gas international quality
Liquefied natural gas pressure measurement method
Liquid phase standard device
LNG Execution
Liquefied natural gas transport gas leak
Liquefied gas probe installation
gb 41319

《GB/T 41319-2022液化天然气(LNG)加液装置》由333(住房和城乡建设部)归口,主管部门为住房和城乡建设部。


Introduction

Analysis of the core content of the standard

Technical elementsOld version requirements2022 version new regulationsUpgrade points
Design pressure1.6MPa as the main oneNew 2.5MPa levelAdapt to high-pressure filling needs
Safety valve settingConventional dischargeMust be treated by EAG heaterPrevent direct discharge of low-temperature gas
Emergency shut-off responseUnspecified time limitValve closing time ≤10 secondsStrengthen emergency response capabilities

Key technological innovations

5.2.4 LNG pump delivery system requires the submersible pump pool to adopt a vacuum insulation structure with a design temperature of ≤-196℃, which reduces 20% cooling loss compared with traditional designs. The application of a demonstration project shows that this structure can control the daily evaporation rate within 0.3%.


Implementation suggestions

  1. Newly built gas filling stations should give priority to the use of integrated liquid filling devices, which comply with the 4.3 model compilation rules
  2. Regularly calibrate the safety relief device to ensure that the startup pressure error is ≤±5% (Clause 7.8)
  3. The low-temperature nitrogen test should be operated in accordance with Appendix A, and the cooling rate should be strictly controlled at 8-10℃/h

Sample only — not a preview of GB/T 41319-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend