GB/T 41585-2022 in English
VALIDSpecification of draw-up commissioning program for pressurized water reactor nuclear power plants
- Issued on:2022-07-11
- Implemented on:2023-02-01
- File Format:PDF
- Delivery:Via email within 5 business days
$359.00
《GB/T 41585-2022压水堆核电厂调试大纲编写规范》由TC58(全国核能标准化技术委员会)归口,TC58SC3(全国核能标准化技术委员会反应堆技术分会)执行,主管部门为国家标准化管理委员会。
Introduction
Systematic construction of commissioning and verification architecture
| Commissioning phase | Core verification objects | Features of new models | Strengthening requirements newly added in this edition |
|---|---|---|---|
| Pre-operation test(A) | Passive residual heat removal system HVAC interface verification | Three-circuit joint commissioning Three-dimensional simulation data verification | Newly added special management chapter for FOAK first reactor test |
| Loading critical phase(B) | Digital Rod Control System Reactive Early Warning Device | Multi-point Neutrino Monitoring Test | Strictly implement the 64-item stage transition review point reduction rules |
Analysis of Standard Evolution and Upgrade Path
- Hierarchical Debugging Plan System: The new version adds the debugging spindle life cycle model (PSCM) methodology
- Digital Handover Requirements: Pilot Application System Equipment Digital Mirror Joint Point Matching Verification
- Containment Verification Expands Automatic Monitoring Points, Sets 400+h Parameter Real-time Feedback Link
Key Site Management Practices
Four Quality Control Upgrade Points:
- Interlock verification modular promotion: divided into 9+self_check self-check module integration and debugging
- Radioactive dual risk control: formulate scheduled shielding plan for expected human industrial imaging equipment
- Equipment empowerment data process: adaptive verification after modification of key process parameter threshold pole spacing
- Transfer condition positioning AKCP performance mark, forming 280-point Checklist closed-loop management
Typical example of equipment cleanliness (controlled at residential protection level)
| Area | Particle size standard (μm) | ISO3465 correction coefficient |
|---|---|---|
| Primary circuit main pump chamber | ≤5(PCUⅣ level) | 1.27~1.35 |
Full text Complete debugging case analysis framework
Based on the commissioning feedback of Fuqing Unit 5: During the SMR multi-effect balance stage, the system elasticity proof instrument procedure was carried out for mandatory appraisal, and the reliability of 8 matchRC comprehensive analysis indicators was successfully verified:
- Added static and dynamic verification tests for the chief alarm response column plug-in program
- Debug Milestone configuration 33-level automatic suspension warning system
- Eliminate the vertical variation of the SDL index of the collected data within 224 hours

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 41576-2022 in English
Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11 -

GB/T 44080-2024 in English
Management specification of reliability, availability, maintainability and safety (RAMS) for nuclear power plants
2024-05-28