GB/T 41669-2022 in English
VALIDSecurity and resilience—Community resilience—Guidelines for planning the involvement of spontaneous volunteers
- Issued on:2022-07-11
- Implemented on:2023-02-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$280.00
$272.00
$272.00
| Standard No: | GB/T 41669-2022 |
| Document status: | VALID |
| Title in English: | Security and resilience—Community resilience—Guidelines for planning the involvement of spontaneous volunteers |
| Title in Chinese: | 安全与韧性 社区韧性 自发志愿者参与计划指南 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2022-07-11 |
| Implemented on: | 2023-02-01 |
| ICS Classification: | 03.100.01-Company organization and management in general |
| Chinese Classification: | A90-Social and public safety in general |
| Professional Classification: | GB-National Standard |
| Related Topics: | volunteer
toughness Toughness and Shrinkage community volunteer more tough participate Self-safety design Metrology and Safety Resilience Verification most participants spontaneity zero toughness toughness standard Toughness parameter Toughness Specifications enhanced toughness GB/T 41669 GB/T 41669-2022 |
《GB/T 41669-2022安全与韧性 社区韧性 自发志愿者参与计划指南》由TC351(全国公共安全基础标准化技术委员会)归口,主管部门为国家标准化管理委员会。
Introduction
I. Evolution of Standard Technical Framework
| Framework Elements | 2008 Edition SB/T 10401 | 2022 New Standard | Iteration Characteristics |
|---|---|---|---|
| Emergency Response Cycle | Single Phase of Emergency Rescue | Full Cycle Coverage (Response/Recovery/Reconstruction) | Enhance System Continuity |
| Evaluation Dimensions | Execution Process Monitoring | Golden Link Index Value System | Quantitative Management Improvement |
II. Analysis of Volunteer Implementation Route
5.7.5.2 Communication Strategy Model
Based on the data collected by the UAV Survey System, a dynamic volunteer communication matrix is established:
- Primary response phase: radio encryption channel opening time window ≤15 seconds
- 1:500 digital map loading time <3.7 seconds (measurement environment Class C standard)
III. Execution Evaluation Operation Checklist
Implementation factor scoring system improved and formulated based on the task list in Appendix A:
| Key Items | Baseline threshold | Optimal value | Practical reference value |
|---|---|---|---|
| Volunteer training baseline | 3H/quarter | Cumulative 56H×3 years | 12.75H/institution (Statistics 2021) |
Sample only — not a preview of GB/T 41669-2022

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 45953-2025 in English
Specification for security management systems of supply chain
2025-08-01 -

GB/Z 42476-2023 in English
Societal security—Emergency management—Message structure for exchange of information
2023-03-17 -

GB/T 31595-2025 in English
Security and resilience—Business continuity management systems—Guidance on the use of GB/T 30146
2025-10-05