《GB/T 41823-2022核电厂安全重要物项用焊接材料质量管理规范》由TC58(全国核能标准化技术委员会)归口,TC58SC3(全国核能标准化技术委员会反应堆技术分会)执行,主管部门为国家标准化管理委员会。
Introduction
Background of Standard Specification Formulation
This specification replaces the original industry technical guidelines and establishes a five-level quality control model: starting from material selection demonstration, through assessment testing, production process traceability, two-way acceptance system and usage scenario monitoring. In particular, the special requirements for welding materials of third-generation nuclear power units such as AP1000 and Hualong One have been strengthened, and the requirements for radiation resistance verification have been strengthened.
Analysis of term definitions
| Terms | Key points of definition | Implementation impact |
|---|---|---|
| Important safety items | Key components affecting radiation protection | Triggering SIL2 quality control |
| Quality certification documents | Data package containing more than 200 parameters | Mandatory blockchain storage |
Quality management system architecture
Standard-based Process control system includes:
- Manufacturing side: Recipe management system (approval by separation of powers)
- Purchasing end: dual-source verification mechanism (cross-verification of certification materials)
- User end: three-level attenuation protection (dynamic monitoring of temperature and humidity)
Analysis of key technical points
Material assessment requirements
| Project | Manufacturer assessment | User assessment |
|---|---|---|
| Test temperature | -30℃~+350℃ gradient | Extreme value of working condition simulation |
| Detection frequency | 1 time/100kg | First piece must be inspected + 5% random inspection |
Procurement control requirements
Risk procurement management system stipulates that secondary suppliers must implement full-project DPU testing, and the number of charged particles in the flux is included in the key assessment indicators.
Engineering Application Guide
| Phase | Core Elements | Tolerance Standard |
|---|---|---|
| Storage Management | Temperature Fluctuation ≤±2℃ | 4.3 Chapter Mandatory Clauses |
| Failure Disposal | 24-hour Root Cause Analysis | 2 times of over-limit shutdown |

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 16702.3-2025 in English
Design specification for mechanical components in nuclear island of pressurized water reactor nuclear power plants—Part 3: Class 2 components
2025-02-28 -

GB/T 29308-2012 in English
Management requirement of ageing of instrumentation and control systems important to safety for nuclear power plants
2012-12-31 -

GB/T 41718-2022 in English
Guideline for critical component condition monitoring management in nuclear power plant
2022-10-12 -

GB/T 22158-2021 in English
Code for fire protection design of nuclear power plant
2021-10-11