Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
hierarchy traditional project management agile management goal project management agilization introduction agile project management agile management project delivery cycle strength scopewarning water treatment systems component quality management
GB/T 42892-2023 in English

GB/T 42892-2023 in English

VALID

Guidance of project management agilization

  • Issued on:2023-08-06
  • Implemented on:2023-08-06
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00
Standard No: GB/T 42892-2023
Document status: VALID
Title in English: Guidance of project management agilization
Title in Chinese: 项目管理敏捷化指南
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2023-08-06
Implemented on: 2023-08-06
ICS Classification: 03.100.40-Research and development
Chinese Classification: A02-Economic Management
Professional Classification: GB-National Standard
Related Keywords: hierarchy traditional project management agile management goal
project management agilization introduction
agile project management
agile management
project delivery cycle
Related Topics: project management
Graphitization degree project
Project Guide Energy
biochemical project iron
biochemical project iron
Chemistry surface project
Sensitized
Management Awards
project management
agile
Project optimization
4 allergens
13th Five-Year Project Guide
48 allergens
29 allergens
32 allergens
npr project management
Allergens 19 items
Agile and adaptable
Biochemical Project CG-D
defense project management
national agility

《GB/T 42892-2023项目管理敏捷化指南》由TC343(全国项目管理标准化技术委员会)归口,主管部门为国家标准委。


Introduction

1. Standard Overview

GB/T 42892-2023, National Standard of the People's Republic of China, "Guidelines for Agile Project Management", is jointly issued by the State Administration for Market Regulation and the National Standardization Administration. This standard aims to guide organizations of all kinds to achieve flexible response and efficient delivery of projects in a complex and changing environment, and to provide a systematic framework and implementation method for the agile transformation of projects.

2. Core Framework and Methodology

The core framework of this standard revolves around the agility of projects, programs and portfolios:

  • Project Agility: Starting from the minimum viable product (MVP), maximize value through iterative incremental delivery.
  • Program Agility: Integrate the results of multiple projects based on a unified value stream and delivery rhythm.
  • Portfolio Agility: Dynamically adjust investment strategies and resource allocation based on strategy.
Management hierarchy Traditional project management Agile management
Goal setting Static requirements analysis Dynamic adjustment of priorities
Delivery method One-time delivery Iterative incremental delivery
Risk response Post-centralized processing Continuous feedback and adjustment

3. Implementation path

Case Study: A high-tech company reduced its project delivery cycle by 40% and increased customer satisfaction by 25% by introducing agile management.


4. Measurement and Improvement

  • Key Indicators:Value realization rate, delivery efficiency, team collaboration.
  • Improvement Measures:Regular review meetings, lessons learned, and process optimization.

Sample only — not a preview of GB/T 42892-2023
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend