Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
key test methods test items test principle core parameters equipment requirements mechanical cement plugs introduction analysis mechanical cementing plugs typical test device configuration subsystem technical requirements standard basis test string ≥10m sealing pressure test 22461.1-2023 surface chemical analysis paclang fasteners diagonal
GB/T 43599-2023 in English

GB/T 43599-2023 in English

VALID

Petroleum drilling and production equipment—Evaluation and testing of mechanical cement plugs

  • Issued on:2023-12-28
  • Implemented on:2024-07-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $370.00
$359.00
Standard No: GB/T 43599-2023
Document status: VALID
Title in English: Petroleum drilling and production equipment—Evaluation and testing of mechanical cement plugs
Title in Chinese: 石油天然气钻采设备 机械式固井胶塞的测试与评价
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2023-12-28
Implemented on: 2024-07-01
ICS Classification: 75.180.10-Exploratory and extraction equipment
Chinese Classification: E92-Petroleum drilling & production equipment and instrument
Professional Classification: GB-National Standard
Related Keywords: key test methods test items test principle core parameters equipment requirements
mechanical cement plugs introduction analysis
mechanical cementing plugs
typical test device configuration subsystem technical requirements standard basis test string ≥10m
sealing pressure test
Related Topics: glue test
The difference between glue fixing machine and degluing machine
Petroleum machinery and equipment design
Petroleum organic carbon evaluation
Petroleum logging equipment
Drilling equipment testing
Drill Rig Evaluation

《GB/T 43599-2023石油天然气钻采设备 机械式固井胶塞的测试与评价》由TC96(全国石油钻采设备和工具标准化技术委员会)归口,主管部门为国家标准委。


Introduction

Analysis of the core technical requirements of the standard

GB/T 43599-2023 standard systematically regulates the full life cycle test system of mechanical cementing plugs, focusing on their functional reliability under complex downhole working conditions. The standard innovatively divides the test items into two categories: basic performance (such as 5.1 penetration pressure test) and working condition simulation (such as 5.6 passing ability test).


Take underwater release plugs as an example. Its unique back pressure bearing capacity test requires simulating the 3,000-meter water pressure environment on the seabed. The test device needs to be equipped with a dual pressurization system (upper loading + lower back pressure), which is significantly different from the test of conventional land-based plugs.

Comparison of key test methods

Test items Test principle Core parameters Equipment requirements
5.2 Sealing pressure test Simulated pressure bearing state after sealing Pressure drop ≤3% after 15min of pressure maintenance Class 0.5 pressure instrument
5.7 Wear resistance test Cyclic friction mass loss △m≤0.15%/m Rotating roller wear machine
5.9 Anti-rotation ability test Torque loading test ≥800N·m Level 2 torque meter

Technology evolution and implementation suggestions

Compared with the old version of SY/T 7084, this standard adds 5.3 rollover pressure test and 5.8 compression deformation test, reflecting the industry's attention to the working conditions of abnormal seating and long-term storage of rubber plugs. Notes for implementation:

  1. For graded cementing plugs, 5.1 penetration test and 5.6 passing ability test must be performed simultaneously
  2. High temperature conditions (>120℃) test requires the use of synthetic oil medium with a flash point ≥140℃
  3. For wear resistance test, the actual string circulation method is preferred instead of the material test method

Typical test device configuration

Subsystem Technical requirements Standard basis
Test string ≥10m casing + coupling combination GB/T 29166
Pressure system Displacement ≥15L/s adjustable Clause 4.3.2.2
Measurement system Temperature accuracy ±1℃ Clause 4.3.3.2

Sample only — not a preview of GB/T 43599-2023
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend