Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
photovoltaic power project scopethis code construction organization planning construction organization design grid-connected photovoltaic power generation projects building integrated photovoltaic project automatic telephone digital radiography sports facilities part
GB/T 50795-2012 in English

GB/T 50795-2012 in English

VALID

Code for construction organization planning of photovoltaic power project

  • Issued on:2012-06-28
  • Implemented on:2012-11-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $760.00
$738.00
Standard No: GB/T 50795-2012
Document status: VALID
Title in English: Code for construction organization planning of photovoltaic power project
Title in Chinese: 光伏发电工程施工组织设计规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2012-06-28
Implemented on: 2012-11-01
Professional Classification: GB-National Standard
Related Keywords: photovoltaic power project scopethis code
construction organization planning
construction organization design
grid-connected photovoltaic power generation projects
building integrated photovoltaic project
Related Topics: Photovoltaic
generate electricity
tissue autofluorescence
tissue autofluorescence
High-quality photovoltaic power generation
Optoelectronic Engineering
Photovoltaic engineering
PV
Optoelectronic Engineering
Photovoltaic engineering
Within-group design vs. between-group design
Between-group design and within-group design
How to Measure Tissue Engineering
engineering electrician
Applications of Tissue Engineering
Photovoltaic English
Photovoltaic power generation project construction acceptance
tissue engineered bone
Construction design
Construction organization design of hydraulic concrete
GB50795
GBT50795
Engineering construction organization design
Photovoltaic module installation
Construction organization design of railway engineering
Construction design specifications GB/T50502
GBT 50502-2009 Construction organization design of construction projects
Photovoltaic power generation construction specifications GB50794-2012
Specifications for construction organization and design of photovoltaic power generation projects gb/t50795-2012
Construction organization design specifications (gb/t50502-2009)
The latest quality assessment standards for civil construction projects of photovoltaic power stations
Ergonomics design specifications
Thermal power project construction organization design
Group installation and construction organization standards
Are there any standard specifications for construction organization design?
Photovoltaic power generation project bill of quantities pricing
Photothermal photovoltaic design
gbt50795
gb/t 50795
Photovoltaic power generation construction organization design

本规范是一项新颁布的国家标准,由中华人民共和国住房和城乡建设部第1430号公告批准,编号为GB/T50795-2012,自2012年11月1日起实施。
本规范适用于地面安装和光伏建筑附加(BAPV)的新建、改建和扩建并网型光伏发电工程施工组织设计。本规范不适用于光伏建筑一体化工程(BIPV)施工组织设计。


1 总则
2 术语
3 基本规定
4 施工准备
5 施工总布置
6 施工临时设施及场地
7 施工总进度
8 主体施工方案及特殊施工措施
9 施工交通运输
10 质量、职业健康安全和环境管理
11 文明施工
附条文说明


Scope

This code is applicable to the construction organization design of ground-mounted and building-additional photovoltaic (BAPV) new, rebuilt and expanded grid-connected photovoltaic power generation projects. This specification does not apply to the construction organization design of Building Integrated Photovoltaic Project (BIPV).

Sample only — not a preview of GB/T 50795-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend