Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
loose soil pile foundation method karst foundation treatment technologies techinical standard secondary measurement standard karst development degreehigh development standard test block husbandry-continuous manure scraper conveyors mopeds wheels scopethis standard
GB/T 51238-2018 in English

GB/T 51238-2018 in English

VALID

Techinical standard for building foundation in karst area

  • Issued on:2018-11-01
  • Implemented on:2019-04-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $1,270.00
$1,232.00


Introduction

Analysis of the core content of the specification

ChaptersKey technical pointsKey indicators
Exploration and evaluationThree-level classification standard for karst development degreeHigh development is indicated when the drilling hole rate is >30%
Red clay foundationDetermination of the depth of the layer with sharp atmospheric impactThe buried depth of the foundation should be>1.5m
Stability calculationVerification of the safe thickness of the cave roofBending safety factor ≥1.35

Comparison of karst foundation treatment technologies

Filling method: Suitable for caves with a height of less than 3m, using C20 concrete or foam lightweight soil (foaming ratio 800-1200)
Spanning method: The span of the beam-slab structure should be greater than 1.5 times the diameter of the cave, and the supporting surface needs to be cleared of loose soil
Pile foundation method: The pile end enters the stable rock layer ≥3 times the pile diameter, and the cave section needs to use steel casing to stop water

Construction monitoring requirements

  • Settlement observation accuracy: Secondary measurement standard (±0.5mm)
  • Water level monitoring frequency: Once every 2 hours during precipitation
  • Pore water pressure measurement point spacing: 2-5m vertical arrangement