GB/T 7178.3-2006 in English
ABOLISHEDThe operating for railway shunting―Part 3: Operating for the mechanized hump
- Issued on:2006-08-22
- Implemented on:2007-01-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$120.00
$117.00
$117.00
《GB/T 7178.3-2006铁路调车作业 第3部分:半自动化驼峰作业》由347(国家铁路局)归口,主管部门为国家铁路局。
本部分规定了铁路调车半自动化驼峰作业的程序、项目、内容、作业人员、技术要求等。本部分适用于国家铁路、合资铁路、地方铁路、专用铁道半自动化驼峰解体列车及下峰技术作业。
Scope
This part of GB/T 7178 specifies the procedures, items, content, operators, technical requirements, etc. of the semi-automatic hump operation of railway shunting. This part applies to national railways, joint-venture railways, local railways, and special-purpose railways for semi-automatic hump dismantling trains and downhill technical operations.
Sample only — not a preview of GB/T 7178.3-2006

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.