GB/T 9224-2025 in English
VALIDDC periodmeters
- Issued on:2025-08-01
- Implemented on:2026-02-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$262.00
| Standard No: | GB/T 9224-2025 |
| Document status: | VALID |
| Title in English: | DC periodmeters |
| Title in Chinese: | 直流周期计 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2025-08-01 |
| Implemented on: | 2026-02-01 |
| Superseding: |
GB/T 9224-1998 D.C. periodmeters
|
| ICS Classification: | 27.120.20-Nuclear power plants. Safety |
| Chinese Classification: | F82-Nuclear instrument for reactor |
| Professional Classification: | GB-National Standard |
| Related Keywords: | improved test consistency range clause
requirements test period measurement range key test equipment low-noise dc environmental adaptability stability requirements clause |
| Related Topics: | streaming cycle
Streaming Period Fixed periodic flow periapoptosis Uniform streaming cycle flow cycle test streaming cycle, how streaming check cycle flu season audit cycle GBT9224 |
《GB/T 9224-2025直流周期计》由TC30(全国核仪器仪表标准化技术委员会)归口,TC30SC1(全国核仪器仪表标准化技术委员会通用核仪器和辐射探测器分会)执行,主管部门为国家标准委。
Introduction
GB/T 9224-2025, "DC Periodometer," is the second revision of the 1998 edition. This revision fully addresses the digital and intelligent development needs of nuclear power plants, as well as the increased measurement accuracy requirements resulting from over two decades of technological advancement. The standard was proposed and coordinated by the National Technical Committee for Standardization of Nuclear Instruments (SAC/TC30), with key drafting organizations including China National Nuclear Corporation Control Systems Engineering Co., Ltd. and Tsinghua University.
Analysis of Major Technical Changes
Compared with the 1998 edition, the 2025 edition of the standard has made important adjustments in technical content and structure:
| Revised Content | 1998 Edition | 2025 Edition | Technical Significance |
|---|---|---|---|
| Definition of Terms | Undefined Full Scale Value | New Definition of Full Scale Value (3.3) | Unified Measurement Benchmark and Improved Test Consistency |
| Range | Clause 4.3.1 | Clause 4.2, Scope Expansion | Adapt to a Wider Range of Applications |
| Error description | Clause 4.3.2 | Clause 4.3, improved accuracy | Measurement error requirement is better than 5% |
| Environmental adaptability | Relative humidity range is narrow | Clause 4.6.1, expanded humidity range | Enhanced equipment environmental adaptability |
| Stability requirements | Clause 4.5 | Clause 4.7, more stringent requirements | 72 hours of continuous operation additional error ≤5% |
Detailed explanation of key technical requirements
Measurement performance indicators
DC periodometer's core performance indicators include:
- Range: Period measurement range is -∞~-50s and 5s~∞, input current range is 10⁻¹¹A~10⁻³A
- Measurement error: Under standard test conditions, the measurement error of the period output value should be better than 5%
- Response time: When the initial current is 10⁻¹¹A and the shortest period is 5s, the response time is ≤15s
- Zero swing: When the input current is the most sensitive range, the output swing is ≤3%
Environmental adaptability requirements
The standard specifies detailed environmental adaptability indicators:
| Environmental type | Test conditions | Qualification criteria |
|---|---|---|
| Climate environment | Low temperature operation, high temperature operation (45℃), constant humidity and heat (93%±3%, 40℃) | Additional error during and after the test ≤5% |
| Transportation environment | Random vibration (10-200Hz), shock (300m/s²) | Measurement error after the test is better than 5% |
| Electromagnetic compatibility | According to GB/T11684 requirements | Meet the requirements of Class A items |
Test methods and implementation points
Standard test conditions
Requirements for key test equipment
- Low-noise DC current generator (10⁻¹²A to 10⁻³A, accuracy better than 1%)
- 4.5-digit digital voltmeter
- 1500V withstand voltage tester
- 500V megohmmeter
- Millivolt recorder
Inspection Rules and Quality Control
Factory Inspection Requirements
Each DC periodometer must undergo a comprehensive inspection before shipment, including visual inspection, measurement error testing, and response time testing, to ensure product quality consistency.
Type Inspection Conditions
Type inspection is required in the following circumstances: new product development, major process changes, resumption of production after a long shutdown, and quality supervision requirements, to ensure continued compliance with standard requirements.
Implementation Suggestions and Application Guidance
Equipment Selection Suggestions
When selecting a DC periodometer, focus on:
- Whether the measurement accuracy meets the 5% error requirement
- Whether the environmental adaptability meets the on-site use conditions
- Whether the electromagnetic compatibility performance meets Class A requirements
- Whether the stability meets the 72-hour continuous operation requirement
Key Points for Installation and Commissioning
Pay attention to the following during installation and commissioning:
- Ensure that the test equipment accuracy meets the requirements
- Test in strict accordance with standard test conditions
- Pay attention to the warm-up time requirements to ensure measurement stability
- Take good electromagnetic shielding measures to reduce external interference
Maintenance Requirements
Regular maintenance should include:
- Perform insulation resistance tests regularly
- Inspect the appearance and mechanical properties
- Verify measurement accuracy
- Re-check environmental adaptability
Significance of standard implementation
The implementation of GB/T 9224-2025 will have a significant impact on the nuclear instrument industry:
- Unify the technical requirements and test methods of DC periodometers
- Improve the reliability and safety of nuclear reactor measurement systems
- Promote technological progress and industrial upgrading in the nuclear instrument manufacturing industry
- Provide technical support for the safe operation of nuclear power plants
This standard will be issued and implemented in 2025, replacing the 1998 version of the standard. All relevant units should update their technical documents in a timely manner to ensure that their products meet the latest standard requirements.