Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
plastic quick-installation scaffolding glass fiber plastic quick-erectable mobile quick-installation scaffolding prefabricated elements scopethis standard grid division book cover battery swap operation service systems
JC/T 2287-2014 in English

JC/T 2287-2014 in English

VALID

Glass fiber reinforced plastic quick-erectable mobile scaffolding made of prefabricated elements

  • Issued on:2014-12-24
  • Implemented on:2015-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $410.00
$398.00

本标准规定了玻璃纤维增强塑料快装脚手架的结构、分类和标记、材料及配件、要求、试验方法、检验规则、标志、包装、运输及贮存。
本标准适用于拉挤或拉挤缠绕工艺制作的玻璃纤维增强塑料型材为主构件的,用于电力登高作业、机械安装及维修登高作业等工业登高作业的脚手架。
本标准不适用于建筑施工快装脚手架。


Scope

This standard specifies the structure, classification and marking, materials and accessories, requirements, test methods, inspection rules, marking, packaging, transportation and storage of glass fiber reinforced plastic quick-installation scaffolding (hereinafter referred to as scaffolding). This standard is applicable to scaffolding with glass fiber reinforced plastic profiles as the main component made by pultrusion or pultrusion winding process, used for industrial climbing operations such as electric power climbing operations, mechanical installation and maintenance climbing operations. This standard does not apply to quick-installation scaffolding for construction.

Sample only — not a preview of JC/T 2287-2014
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend