Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
cast-in-situ concrete hollow floor scopethis standard cast-in-place concrete hollow floor cast-in-situ concrete hollow floors cast-in-place concrete hollow floors cast-in-place concrete floor porcelain housings gauge grinders heat-resisting steel forgings
JC/T 952-2014 in English

JC/T 952-2014 in English

VALID

Filler for cast-in-situ concrete hollow floor

  • Issued on:2014-10-14
  • Implemented on:2015-04-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $310.00
$301.00

本标准规定了现浇混凝土空心楼盖用填充体的分类、术语与定义、材料、要求、试验方法、检验规则、标志、堆放与运输。
本标准适用于工业与民用建筑中现浇混凝土空心楼盖用填充体。该填充体永久填充在现浇混凝土空心楼盖内,其作用是仅为在现浇混凝土楼盖内实现按建筑结构要求形成的空心,而不参与任何结构受力。


Scope

This standard specifies the terms and definitions, classification, specifications, dimensions and markings, materials, requirements, test methods, inspection rules and marking, stacking and transportation of fillers for cast-in-situ concrete hollow floors. This standard applies to fillers for cast-in-place concrete hollow floors in industrial and civil buildings. The filling body is permanently filled in the cast-in-place concrete hollow floor, and its function is only to realize the hollow formed according to the requirements of the building structure in the cast-in-place concrete floor, without participating in any structural stress.

Sample only — not a preview of JC/T 952-2014
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.