Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
dredging engineering dredging construction engineering underwater earthwork excavation engineering engineering construction engineering construction organization design dual-flow lightning protection devices standard test items technical indicators test methods spray volume reference hearing threshold levels scopethis part
JTJ 319-1999 in English

JTJ 319-1999 in English

ABOLISHED

The Technical Code of Dredging Engineering

  • Issued on:1999-04-23
  • Implemented on:1999-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $1,750.00
$1,698.00
Standard No: JTJ 319-1999
Document status: ABOLISHED
Title in English: The Technical Code of Dredging Engineering
Title in Chinese: 疏浚工程技术规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 1999-04-23
Implemented on: 1999-12-01
Chinese Classification: P67-Port and waterway engineering
Professional Classification: JT-Transport
Related Keywords: dredging engineering
dredging construction
engineering underwater earthwork excavation engineering
engineering construction
engineering construction organization design
Related Topics: Sparse +
Dredging Engineering Technology
dredging
dredging works
Shi Weijun
jtj319


1 General Provisions

1.0.1 This Code is formulated with a view to unifying technical standards of dredging engineering, enhancing work quality and technical level of design and construction of dredging engineering and adapting to dredging development and engineering management requirements.
1.0.2 This Code is applicable to the design and construction of capital and maintenance dredging and reclamation engineering along the coast, at inland ports and channel. Such engineering as construction of artificial island, beach protection and bank protection, excavation and coverage of submarine pipe ditch as well as water resources dredging, environmental dredging and sand excavation may refer to this Code. This Code is not applicable to reinforcement of reclamation foundation.
1.0.3 The design and construction of dredging engineering shall not only comply with those specified in this Code, but also shall meet the requirements of JTJ/T 320 Classification of Rocks and Soils to be Dredged, JTJ/T 321 Standard for Measuring of Quantities of Soils and Rocks in Dredging Works, JTJ 203 Specifications for Port and Waterway Engineering Survey and JTJ 312 Technical Code of Regulation Works for Navigation Channel etc.


2 Terms

2.0.1 Dredging engineering
Underwater earthwork excavation engineering conducted in order to widen and deepen water area by manpower, hydraulic or mechanical method.
2.0.2 Reclamation
The operation of conveying the sand excavated by a dredger to designated place via discharge pipeline.
2.0.3 Capital dredging
Constructed, renovated or extended dredging for opening new channel and port etc. or increasing their dimensions and improving navigation conditions.
2.0.4 Maintenance dredging
Dredging of removing underwater deposits in order to maintain or restore the original dimension of a certain designated water area.
2.0.5 Low cost dredging
Dredging operation conducted by simple dredging equipment or dredging method.
2.0.6 Fluid mud layer
A silt layer between upper-layer clear water and river bottom or seafloor, consisting of flocculated sludge and of specified density and fluidity.
2.0.7 Over-depth
Depth increased from design depth due to construction error, in order to reach designed dredging depth.
2.0.8 Calculated over-depth
Calculated average over-depth counted in dredging engineering quantity in accordance with the design or construction arrangement.
2.0.9 Allowable over-depth
Maximum over-depth allowed within the dredge area, as specified in the design in accordance with engineering property.
2.0.10 Calculated over-width
Average over-excavation width required to be increased due to construction error in order to reach the bottom width as specified in the design in accordance with the design or construction arrangement.
2.0.11 Allowable over-width
Maximum over-width allowed of the dredge area bottom, in the completion acceptance according to engineering property requirements.


3 Field Investigation and Survey

3.1 General Requirements
3.1.1 Prior to the design and construction of dredging and reclamation engineering, investigations and surveys shall be conducted at the engineering site, mainly including the following basic contents:
(1) Water depth and topographic survey;
(2) Hydrological conditions;
(3) Meteorological conditions;
(4) Geological survey and rock-soil test;
(5) Soil disposal site investigation;
(6) Dredging and environmental impact investigation;
(7) Investigation on construction organization conditions.
Detailed degree of field investigation and survey shall be determined according to such conditions as engineering property, scale, importance and available information; and sources and reliability degree of its information shall be analyzed.
3.1.2 Investigation and survey work shall meet the requirements of engineering design and construction. Large-scale or complex engineering may be conducted in two stages of design and construction.
... ...
... ...
For small-scale engineering covering an area of less than 3×105m2, its design stage may not be divided and its scale should be adopted as 1:500~1:1 000.
3.2.2 Plan control network should be arranged in a densified way within the national-level control network. Uniform rectangular plane coordinate system of Gauss conformal projection shall be adopted. In small survey area where control system is not established, simplified method may be adopted to directionally establish independent coordinate system. In the same survey area, the same coordinate system shall be adopted.
3.2.3 "1985National Elevation Datum" shall be adopted as the elevation datum. If other elevation datum is adopted, its relationship with national elevation datum shall be obtained.
For the depth datum for survey of water depth, in coastal and tidal reach, the theoretically lowest tide level counted from multi-year mean sea level shall be adopted; in the inland river, navigational datum shall be adopted. Where other depth datum is adopted, its relationship with local elevation datum shall be obtained. For the map of the same engineering, the same datum shall be adopted.
3.2.4 In the surveying and positioning by global positioning system (GPS), GPS local engineering network shall be established as the control network of the survey area and conversion parameter of WGS-84 coordinate and coordinate system used in the engineering shall be obtained. Where the elevation measured by GPS is converted to normal height, 1985 National Elevation Datum or local original elevation system shall be adopted as its elevation system.

1 General Provisions
2 Terms
3 Field Investigation and Survey
3.1 General Requirements
3.2 Water Depth and Topographic Survey
3.3 Hydrology
3.4 Meteorology
3.5 Geological Survey and Rock-soil Test
3.6 Environmental Impact Investigation
3.7 Investigation on Soil Treatment Area
3.8 Investigation on Construction Conditions
4 Engineering Design and Technical Preparation
4.1 General Requirements
4.2 Selection and Dimension of Dredging Area
4.3 Dredging Slope Design
4.4 Dredging Over-width and Over-depth
4.5 Dredging and Environmental Influence
4.6 Treatment of Dredging Soil
4.7 Reclamation Engineering Design
4.8 Determination of Engineering Quantity
4.9 Selection of Dredging Equipment
4.10 Engineering Schedule and Budgetary Estimate, Budget
5 Engineering Construction
5.1 General
5.2 Engineering Construction Organization Design
5.3 Site Preparation
5.4 Dispatchment of Construction Vessel and Equipment
5.5 Dredging Construction
5.6 Capital Dredging
5.7 Maintenance Dredging
5.8 Rock Dredging
5.9 Construction of Reclamation Engineering
5.10 Field Control and Engineering Management
5.11 Safety
5.12 Completion Acceptance
Appendix A (Informative) Table of Dredged Rock-soil Test Items
Appendix B Determination of Dredge Pump and Pipeline Operating Conditions
Appendix C Calculation of Dredger Productivity
Appendix D Calculation of Time Utilization Rate of Dredgers
Appendix E Statistical Analysis of Dredger Working Time
Appendix F Selection of Auxiliary Vessel
Appendix G Battening down and Reinforcement for Dredger and Sea-going Equipment of Auxiliary Vessel
Appendix H Explanation of Wording in this Code
Additional Explanation

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend