Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
hydropower projects introductionthis document reservoir projects reservoir special items reservoir-specific projects hydropower engineering track mobile crushing drawing machines inflation tire traction thickener scopethis standard
NB/T 10141-2019 in English

NB/T 10141-2019 in English

VALID

Specification for Investigation of Reservoir Special Items for Hydropower Projects

  • Issued on:2019-06-04
  • Implemented on:2019-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $600.00
$582.00
Standard No: NB/T 10141-2019
Document status: VALID
Title in English: Specification for Investigation of Reservoir Special Items for Hydropower Projects
Title in Chinese: 水电工程水库专项工程勘察规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2019-06-04
Implemented on: 2019-10-01
Professional Classification: NB-Energy
Related Keywords: hydropower projects introductionthis document
reservoir projects
reservoir special items
reservoir-specific projects
hydropower engineering
Related Topics: special project
water works
hydropower project
a project by a
Engineering five inspections
NB/T20006.44-2019
Iron ore engineering survey
Transmission line engineering survey
Engineering survey specifications for pressurized water testing
nb/t10320-2019
nb/t 10158-2019
nb/t 10372-2019
nb/t 10175-2019
nb/t 10205-2019
nb/t 10289 - 2019
nb/t 10287-2019
nb/t 10288-2019
nb/t10634-2019
nb/t 10292-2019
nb/t 10133-2019
Nuclear power engineering geological survey
nb/t10181-2019


Introduction

This document provides technical guidelines for the investigation of reservoir-specific projects in hydropower engineering. It outlines the procedures, methods, and requirements for conducting detailed surveys and assessments related to reservoir construction and management. The content covers various aspects including site selection, geological investigation, hydrological analysis, and environmental impact evaluation. It also includes specifications for data collection, analysis, and reporting. The document serves as a reference for professionals involved in the planning, design, and implementation of reservoir projects within the hydropower sector. It emphasizes the importance of accurate and comprehensive investigations to ensure the safety, efficiency, and sustainability of reservoir operations. The guidelines are applicable throughout the project lifecycle, from initial feasibility studies to final construction and maintenance phases.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of NB/T 10141-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • NB/T 33003-2010 in English

    NB/T 33003-2010 in English

    Communication protocols between off-board charger monitoring unit and battery management system for electric vehicle

    2010-05-01
  • NB/T 20107-2012 in English

    NB/T 20107-2012 in English

    Technical Regulation for Construction of Reactor Coolant Pump Installation in PWR Nuclear Power Plant

    2012-01-06
  • NB/T 11121-2023 in English

    NB/T 11121-2023 in English

    Digital construction of underground coal mine - Evaluation index and method

    2023-02-06
  • NB/T 25013-2013 in English

    NB/T 25013-2013 in English

    Test Requirements for Generator Unit First Synchronization of Nuclear Power Plant

    2013-06-08
  • NB/T 42053-2015 in English

    NB/T 42053-2015 in English

    Technical Specification of Anti-islanding test apparatus

    2015-04-02
  • NB/SH/T 0723-2014 in English

    NB/SH/T 0723-2014 in English

    Standard test method for evaluation of corroesiveness of diesel engine oil at 121℃

    2014-06-29
  • NB/T 10123-2018 in English

    NB/T 10123-2018 in English

    Technical conditions of "Head-end blocking and then grouting in the internal" borehole sealing technology for coal mine gas drainage

    2018-12-25
  • NB/T 35023-2014 in English

    NB/T 35023-2014 in English

    Design code for sluice

    2014-06-29
  • NB/T 20174-2012 in English

    NB/T 20174-2012 in English

    Technical Specification for Onsite Manufacture and Acceptance of Carbon Steel & Stainless Steel Tanks of PWR Nuclear Island

    2012-10-19
  • NB/T 20007.37-2015 in English

    NB/T 20007.37-2015 in English

    Stainless steel for pressurized water reactor nuclear power plants-Part 37:Austenitic stainless steel bars used for non-pressure-retaining components of CRDM

    2015-04-02